PDF Publication Title:
Text from PDF Page: 006
5. Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Work Instructions: Commissioning Checklist Procedures - Capstone MicroTurbine Simulate SA Ready: Use an external 12 or 24 VDC power supply (MicroTurbine UCB may also be used). a) Install a jumper wire between pins 9 and 10 on the DMC terminal. b) Connect the external power supply (+) to pin 6 and power supply (-) to pin 5. c) Power up the external power supply to provide 12 or 24 VDC to the DMC. d) Verify the word “TRIP” appears on the (small) window on the M1 Contactor. e) Using the DMM, verify that there is no continuity between L1 and M1, L2 and M2, and L3 and M3, that is, no continuity between the primary and secondary of the M1 Contactor. f) Using the DMM, measure continuity between pins 1 and 3 on the DMC terminal, and measure OPEN between pins 1 and 2. g) Shut the power supply OFF. h) Disconnect the jumper wire between pins 9 and 10 on the DMC. Repeat the Simulate GC Ready and Simulate SA Ready tests as required to verify the DMC operation. Once this is verified, proceed with configuring the MicroTurbine connections. NOTE 6. Pre-Operational Procedures CAUTION Perform the following procedures with the fuel supply OFF and the power supply OFF. 1. GC/SA Interlock: a) Model C30 - Install Operation Mode Jumper on printed circuit board terminals in the Communications Bay, i.e., TB4 (fourth terminal strip from left), pins 1 and 2 (from bottom) for Grid Connect and pins 1 and 3 for Stand Alone. For Dual Mode, remove all jumpers from pins 1, 2, and 3 and replace with appropriate Dual Mode control wiring. In MutiPac configurations, the GC and SA interlocks are required on the Master unit only. For Dual Mode, remove all jumpers from pins 1, 2, and 3 on the Master unit and replace with appropriate Dual Mode control wiring. b) Model C60 - Install Operation Mode Jumper on printed circuit board terminals in the Communications Bay, i.e., J12 (fourth terminal strip from right), Pins 3 and 5 (from bottom) for Grid Connect and pins 2 and 5 for Stand Alone. For Dual Mode, remove all jumpers from pins 2, 3, and 5 and replace with appropriate Dual Mode control wiring. In MutiPac configurations, the GC and SA interlocks are required on the Master unit only. For Dual Mode, remove all jumpers from pins 2, 3, and 5 on the Master unit and replace with appropriate Dual Mode control wiring. 440052-001 Rev B (January 2004) Page 6 of 10 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Work Instructions Commissioning Checklist Procedures Capstone MicroTurbine
PDF Search Title:
Work Instructions Commissioning Checklist Procedures Capstone MicroTurbineOriginal File Name Searched:
440052_Comm_Procedures_WI.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |