Text from PDF Page: 005

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Work Instructions: Commissioning Checklist Procedures - Capstone MicroTurbine 4. If Stand Alone: a) Is the load applied to MicroTurbine less than the power shown on Derating curves for Ambient Temperature, Back Pressure, and Ambient Pressure? Yes b) If motors are installed, is the inrush current of motors/soft-starting system or maximum load current less than the MicroTurbine specification? Yes (Refer to the Model C30 Electrical Technical Reference [410000] or Model C60 Electrical Technical Reference [410001] as required.) Dual Mode Controller Procedures If a Capstone Dual Mode Controller (DMC) is used with the MicroTurbine, commission the DMC module as follows: Requirements ! Circuit Breaker ! Digital Multimeter (DMM) ! External 12 VDC or 24 VDC Power Supply Procedure 1. Make sure there are no control wiring and power wiring between the MicroTurbine and the DMC. 2. Make sure the load is disconnected. 3. With the grid power OFF, wire the grid terminals to the Breaker, and the Breaker to the DMC line terminals. Make sure that the A, B, C, and G conductors are all properly connected. 4. Simulate GC Ready: a) Verify the M1 Contactor slider switch is set for electrical operation. b) On the front panel of the DMC set S1 to POWER ON position and S2 to AUTO. c) Turn the Breaker ON. d) Using the DMM, verify that M1 Contactor inside DMC closes and the line voltage is available on the secondary side (load and MicroTurbine side) of the M1 Contactor. e) Verify the word “ON” appears in the (small) window on the M1 Contactor. f) Using the DMM, measure continuity between pins 1 and 2 on the DMC terminal and measure OPEN between pins 1 and 3. g) Shut OFF the disconnect breaker (line power). 440052-001 Rev B (January 2004) Page 5 of 10 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Work Instructions Commissioning Checklist Procedures Capstone MicroTurbine

work-instructions-commissioning-checklist-procedures-capston-005

PDF Search Title:

Work Instructions Commissioning Checklist Procedures Capstone MicroTurbine

Original File Name Searched:

440052_Comm_Procedures_WI.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP