PDF Publication Title:
Text from PDF Page: 036
Capstone Turbine Corporation Model C65 User’s Manual (V5.XX) Capstone The timeout period setting establishes the maximum time to achieve the kW setting before the system shuts down automatically. This timeout setting is adjustable from 60 to 3600 seconds in 1 second intervals. Initial Factory Setting is 60 seconds. Refer to MultiPac Operation Technical Reference (410054) as required. Note that the user must be logged in with the current password to change these settings. Fast Transfer Delay Submenu The Fast Transfer Delay submenu applies only to Dual Mode configured systems. This submenu displays the delay timer for the mode transition, in both directions, during fast transfer. The Initial Factory Setting is 0 minutes. The timer can be set from 0 to 30 minutes. The system will operate in Stand Alone Recharge (“hot standby”) state while this timer runs before the transfer is completed. Stand Alone Load Wait Submenu The Stand Alone Load Wait submenu applies only to Dual Mode configured systems. This submenu displays the timer that maintains the system in Stand Alone Load State before the transition back to Grid Connect, after the grid has returned to normal. The timer begins when the utility voltage and frequency are detected to be within the required operating range, and maintains the turbine in the Stand Alone load state until the time has expired. The Initial Factory Setting is 5 minutes. The timer can be set from 5 to 30 minutes. Local Battery Charge Submenu The Local Battery Charge submenu controls whether the system begins a battery equalization charge. This can be done when the system is in Grid Connect mode, or in Standby state, or in the Stand Alone Recharge state (“Hot Standby”). Selecting ENABLE will begin the equalization charge, which can last up to 4 hours. Note that the user must be logged in with the current password to change this setting. Page 36 of 61 400017 Rev A (July 2007) Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. Stand Alone 3/4 Fast Trans DLY 8/10 0.0 Min Stand Alone 3/4 SA Load Wait 9/10 5.0 Min Stand Alone 3/4 Local Batt Chg 10/10 DISABLEPDF Image | C65 5xx
PDF Search Title:
C65 5xxOriginal File Name Searched:
400017A_C65_Users_Manual_V5XX.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |