Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Application Guide: Interconnection for Capstone MicroTurbines Depending on the complexity of the installation, the time to complete the interconnection after the initial meeting varies from two weeks in some states (CA and NY), to six weeks in other states (TX). This is in part due to the complexity of the interconnection and individual utility requirements for protective relay functions. Presently, most Capstone installations involved in the interconnect process are expected to complete within these time frames or sooner. This varies by state and is dependent on the certification of Capstone by each state. Since Capstone Equipment has UL1741 certification, it is expected that in some cases the process can be ‘fast tracked’. Technical factors that can impact the interconnect review process or determine which utility interconnect plan applies include the following: 􏰒 Distribution System at the Point of Common Coupling (PCC): network or radial. 􏰒 Sizeofgenerationfacility. 􏰒 Exportcapacity,asapercentageoffeederorlinesectionpeakload. The interconnection standards are issued in the following States: 􏰒 California(alsoknownasCPUCRule21). 􏰒 NewYork(StandardizedInterconnectionRequirementsandApplication Process). 􏰒 Texas(PUCTDGInterconnectionManual). 􏰒 Ohio 􏰒 Alberta,CalgaryCanada. 􏰒 Illinois(ComEd’s“TheDGBook”). 480001-001 Rev A (April 2003) Page 3 of 11 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the equipment ratings, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Application Guide Interconnection for Capstone MicroTurbines

application-guide-interconnection-capstone-microturbines-004

PDF Search Title:

Application Guide Interconnection for Capstone MicroTurbines

Original File Name Searched:

480001_Interconnection_Application.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP