PDF Publication Title:
Text from PDF Page: 003
17000 CHP COMM TO CHP Communication Time Out (CHP Control Board No Communication) System SSL: 3 CHP SSL: FR Detects a failure of the system to communicate with the CHP Control Board on the Intra-Bus. Without communications it is not possible to determine the heat exchanger temperature, therefore, the system must not run under this condition. Symptom Probable Cause Analysis Repair Solution Communication failure between system and CHP Control Board Grounding Incorrect grounding of the system can lead to intermittent communi- cations problems within the system. Verify system is grounded per installation instructions. Intra harness connection Intra harness carrying messages between CHP Control Board and ECM Control Board could be loose or damaged. Dry and secure Intra harness at CHP Control Board and ECM Control Board. Replace if damaged. Incorrect Software Software is incompatible. Reload current software version. CHP Control Board 1. Check LED’s on CHP Control Board. If all LED’s are ON, go to 2. If any LED is not ON, go to 3. 2. Upload PM’s and restart the unit. If the fault clears and the unit operates normally, the problem is solved. If the fault does not clear, go to 4. 3. Replace CHP Control Board and restart the unit. If the fault clears and the unit operates normally, the problem is solved. If the fault does not clear, go to 4. ECM Control Board 4. Check LED’s on ECM Control Board. If all LED’s are ON, go to 5. If any LED is not ON, go to 6. 5. Upload PM’s on ECM Control Board and restart the unit. If the fault clears and the unit operates normally, the problem is solved. If the fault does not clear, go to 6. 6. Replace ECM Control Board and restart the unit. If the fault clears and the unit operates normally, the problem is solved. If the fault does not clear, go to 7. 7. Troubleshoot ECM Control Board - Refer to the Trouble- shooting a MicroTurbine that Does Not Wake Up section. Hardware configuration Display PIC revision not compati- ble with CHP Control Board Contact Technical Support for instructions on how to obtain the latest PIC revision. Observe Safety Precautions - Refer to Safety Instructions for Details 430013-001 Rev C (July 2003) 14-3 Model C60 Troubleshooting Guide This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Overview SERIES 17000 FAULT CODES Integrated CHP Faults
PDF Search Title:
Overview SERIES 17000 FAULT CODES Integrated CHP FaultsOriginal File Name Searched:
14_17000 Faults.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |