logo

ADVANCED POWER SERVER (APS) USER’S MANUAL

PDF Publication Title:

ADVANCED POWER SERVER (APS) USER’S MANUAL ( advanced-power-server-aps-users-manual )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 038

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Advanced Power Server (APS): User’s Manual Table 10. Fast Transfer Configuration Input Item Definition Input Item Description Available Settings Auto Reconnect Delay (min) Delay that controls the re-connection time of a group of MicroTurbines to the grid (5-minute lower setting is a UL 1741 requirement) 5 to 30 minutes Fast Transfer Delay (min) User settable delay that allows the user to extend the time period that the load is without power above the < 10 second level, during a transition. 0 to 30 minutes SA Load Wait (min) User settable delay that allows the systems to continue to support the load in Stand Alone operation once the grid has returned. Once this timer expires, the MicroTurbines will start their transition back to Grid Connect mode 0 to 30 minutes Minimum Power (Watts) Minimum power required for a Stand Alone system to be capable of carrying on a transitioning into the Stand Alone state from Grid Connect 0to 4,000,000,000 W Min Power Timeout (sec) Timeout period for shutting down the units if there are not enough units to turn on prior to a transition to Stand Alone mode to meet the minimum power setting 0 to 65535 seconds iCHP Group Turbine Settings Integrated combined heat and power individual turbines settings within a group are set through the Group“X”: iCHP Control window as shown in Figure 32. This window allows you to set the iCHP settings for the iCHP turbines within a group. The settings that you can adjust are described in Table 11. Figure 32. Group“X”: iCHP Control Window 400011 Rev A (June 2007) Page 38 of 67 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | ADVANCED POWER SERVER (APS) USER’S MANUAL

advanced-power-server-aps-users-manual-038

PDF Search Title:

ADVANCED POWER SERVER (APS) USER’S MANUAL

Original File Name Searched:

400011_APS_Users_Manual.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP