logo

CAPSTONE C200 MICROTURBINE TECHNICAL REFERENCE

PDF Publication Title:

CAPSTONE C200 MICROTURBINE TECHNICAL REFERENCE ( capstone-c200-microturbine-technical-reference )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 090

CHAPTER 10 Capstone COMMUNICATIONS Operating Mode As described in the Operating Modes section, the C200 microturbine requires both hardware and software inputs to tell it which operating mode to be in. If the system is to be operated only in Grid Connect or Stand Alone modes, a hardwired jumper should be connected as shown in Table 10-1. If the system is to be used in Dual Mode operation, these connections should be controlled externally (such as by using the Capstone Dual Mode System Controller accessory). Configure jumpers or use external contacts for the required operating mode: Table 10-1. Operating Mode Connection Details Grid Connect Only Jumper pins 3 & 5 Grid Connect Stand Alone Only Jumper pins 2 & 5 Stand Alone Start/Stop Inputs The C200 microturbine can be started and stopped in several ways. The proper connections must be provided on terminal J12 for the desired start/stop control function, and the User/Remote options selected from the External Input Dispatch function using CRMS software. User - System is controlled locally through the Display Panel or by using CRMS (no hardwired start input connection required) Remote – Start/Stop input connection wired to the UCB. Remote SA/User GC – Uses Remote Start priority for Stand Alone operation, and User Start priority for Grid Connect operation (for example, when connected to Dual Mode System Controller) Remote GC/User SA – Sets User Start priority for Stand Alone operation, and Remote start priority for Grid Connect operation. Configure hardware connections for the required Start Input mode as follows: Table 10-2. Start/Stop Input Connection Details Operating Mode Terminal J12 Hardware Connections Power Connect Software Setting Dual Mode Use External contact closures instead of permanent jumpers For GC – pin 3 to 5 For SA – pin 2 to 5 Dual Mode Start/Stop Input Mode Terminal J12 Hardware Connections User Remote or Combinations of User & Remote No connectins Pin 4 to 5 410066 Rev C (June 2009) 10-4 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | CAPSTONE C200 MICROTURBINE TECHNICAL REFERENCE

capstone-c200-microturbine-technical-reference-090

PDF Search Title:

CAPSTONE C200 MICROTURBINE TECHNICAL REFERENCE

Original File Name Searched:

410066C_C200_Tech_Ref.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP