logo

Combined Heat and Power Technologies for Wastewater Facilities

PDF Publication Title:

Combined Heat and Power Technologies for Wastewater Facilities ( combined-heat-and-power-technologies-wastewater-facilities )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 047

Chapter 3 Evaluation of Combined Heat and Power Technologies for Wastewater Treatment Facilities 3.1.1 Prime Mover Equipment Costs The cost data presented on Figure 3-1 represent the unit costs for the prime movers only. Costs associated with engineering, digester gas treatment equipment, electrical switchgear, and integration with POTW heat distribution systems, and whether or not the prime movers are housed in a dedicated building with requisite heating, ventilating, and air-conditioning (HVAC) are not included. These costs often represent the majority of the overall project cost. For example a CHP system, consisting of two new 1,750 kW internal combustion engines, constructed in 2010 in Columbus, Georgia was completed for a total cost of approximately $14 million. The internal combustion engines were purchased for a cost of $1 million each, or about 14 percent of the total project cost. 7,000 6,000 5,000 4,000 3,000 2,000 1,000 0 0.10 1.00 Internal Combustion Engine Advanced Lean Burn Engine 10.00 100.00 Fuel Input, MMBtuh Combustion Gas Turbine Microturbine Recuperated Gas Turbine Molten Carbonate Fuel Cell 1,000.00 Figure 3-1. Prime Mover Equipment Costs 3-2 Capital Cost, $/kW

PDF Image | Combined Heat and Power Technologies for Wastewater Facilities

combined-heat-and-power-technologies-wastewater-facilities-047

PDF Search Title:

Combined Heat and Power Technologies for Wastewater Facilities

Original File Name Searched:

300_CHP-EPA-w-Apps.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP