logo

Technical Reference Horizontal Fuel Gas Booster - Model C60/C65 MicroTurbine

PDF Publication Title:

Technical Reference Horizontal Fuel Gas Booster - Model C60/C65 MicroTurbine ( technical-reference-horizontal-fuel-gas-booster-model-c60-c6 )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 013

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Horizontal Fuel Gas Booster - C60/C65 MicroTurbine 4. Prior to operating the MicroTurbine, check all fuel lines as follows: a. Check and verify that all fuel gas connections are tight and secure. b. Open the main manual fuel shut-off. c. Check and verify that all fuel gas connections are tight and secure. d. Using a gas detector or a non-flammable leak detecting fluid, perform a leak check of all gas pressure lines and fittings. No fuel leaks of any kind are allowed. e. Close the main manual fuel shut-off. 7. Follow additional steps listed in Commissioning Checklist (460006). Installation Validation Once installed, an initial operation of the Model C60/C65 with the Fuel Gas Booster combination is required to validate the installation. Refer to the Fuel Gas Booster Owner’s manual for detail information and for Commissioning instructions. Scheduled Maintenance Perform scheduled maintenance in accordance with supplier requirements listed in FGB manufacturer’s documentation and Capstone documentation. Each site should have at least one FGB Installation and Maintenance Tool Kit plus one Maintenance Parts Kit. Refer to the Fuel Gas Booster’s Owner’s Manual for additional information. Filtration Maintenance Filtration including fuel gas, FGB cooling air and lubrication systems shall allow normal operation and only require maintenance at 8000 hour intervals. Lubrication System Maintenance The oil capacity and consumption shall be such that oil replenishment, ir required, is at minimum levels of 8000 hours of operation. Capstone Documentation The following table lists applicable Capstone documentation. Document 410002 460006 Description Capstone MicroTurbine Fuel Requirements Technical Reference Commissioning Checklist – Capstone MicroTurbine 410047 Rev F (February 2006) Page 13 of 14 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Technical Reference Horizontal Fuel Gas Booster - Model C60/C65 MicroTurbine

technical-reference-horizontal-fuel-gas-booster-model-c60-c6-013

PDF Search Title:

Technical Reference Horizontal Fuel Gas Booster - Model C60/C65 MicroTurbine

Original File Name Searched:

410047_Fuel_Gas_Booster_Horiz.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP