logo

Installation Instructions Roll Out Option Kit for Model 330 Industrial Package and Capstone 60 LIP MicroTurbines

PDF Publication Title:

Installation Instructions Roll Out Option Kit for Model 330 Industrial Package and Capstone 60 LIP MicroTurbines ( installation-instructions-roll-out-option-kit-model-330-indu )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 003

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 Installation Instructions: Roll Out Option Kit, Model 330 IP and C60 LIP Accomplishment Instructions This section contains instructions necessary to install the Roll Out Option Kit. These instructions are comprised of the Disassembly and Assembly procedures. Conduct maintenance in a clean, well-lighted area using normal shop tooling to avoid damage to delicate components. Retain all parts removed for use at assembly, unless otherwise specified. Discard all parts as noted in this document. Disassembly The following procedure applies to both the Model 330 Industrial Package and the Capstone 60 LIP Model. Differences are noted as applicable. 1. RemovetheMicroTurbinefromservice.Disconnectallfuellinesandthe electrical power from the MicroTurbine. 2. IftheMicroTurbineisboltedtoitssupportingsurface,thenremovethebolts so the unit is free to be moved, using a forklift or a pallet jack forks. 3. OnasingleMicroTurbineinstallation,inserttheforksintothetwopocketson the right or left side at the base of the unit (see the following Figure). Gently lift the unit directly up to clear the supporting surface by approximately 50 mm (two inches). If necessary, move the MicroTurbine forward sufficiently to gain access to both the front and the back of the MicroTurbine. 4. OnaMultiPacinstallation,inserttheforksintothetwopocketsinfrontofthe unit (see the following Figure). Gently lift the unit directly up to clear the supporting surface. Move the MicroTurbine forward sufficiently to allow the forks to be inserted into the pockets on the left or right side of the unit. Lower the MicroTurbine so it rests on its supporting surface. Insert the forks into the pockets on the side of the unit. Gently lift the unit directly up to clear the supporting surface by approximately 50 mm (two inches). MicroTurbine 513223-001 (Dec 2001) Page 3 of 6 Roll Out Option Kit. Rev. A Capstone Turbine Corporation reserves the right to change or modify without notice the design, the equipment specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. Pockets for Forklift (Both Sides) Pockets for Forklift (Front)

PDF Image | Installation Instructions Roll Out Option Kit for Model 330 Industrial Package and Capstone 60 LIP MicroTurbines

installation-instructions-roll-out-option-kit-model-330-indu-003

PDF Search Title:

Installation Instructions Roll Out Option Kit for Model 330 Industrial Package and Capstone 60 LIP MicroTurbines

Original File Name Searched:

513223_Roll_Out_Option_Kit.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP