Work Instructions Power Distribution Module (PDM) Replacement Capstone Model C60 MicroTurbine

PDF Publication Title:

Work Instructions Power Distribution Module (PDM) Replacement Capstone Model C60 MicroTurbine ( work-instructions-power-distribution-module-pdm-replacement- )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 002

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Work Instructions: Power Distribution Module Replacement – Model C60 MicroTurbine Required Tools 􏰪 10mm Socket 􏰪 #2 Phillips head screwdriver 􏰪 #3 Phillips head screwdriver 􏰪 5/16” socket (90 degree or flexible angle) Procedures 1. Ensure the MicroTurbine system is in the standby state. 2. Remove all power sources and fuel supply from the MicroTurbine system. 3. Remove the MicroTurbine left side panel. 4. Remove ECM cover by removing fourteen #2 Phillips screws. 5. Disconnect cables from Power Distribution Module (PDM) a. J1: High Voltage Power Supply, J2: 24V Power Supply 6. Disconnect J11: Heat sink thermistor cable from ECM Control Board. 7. Disconnect J9 Intra and J12 Inter System / UCB cables from ECM Control Board. 8. Remove ECM Control Board with mounting plate using #3 screwdriver. 9. Disconnect ECM Power board cable connections a. J1 Voltage sense, J4 Power supply, J3 Fan Inverter 10. Remove two 10mm nuts for Bus- connections to Power Board. 11. Remove three 10mm nuts for Bus+ / Brake+ connections to Power Board. 12. Disconnect ECM Power board from the IGBT module by removing three #3 Phillips screws and three 10mm nuts. 13. Remove the ECM Power board by removing the two #2 Phillips screws holding the Capacitor mounting plate at the rear of the package. 14. Remove the ECM power board assembly (power board, capacitors and mounting plate). 15. Remove Power Distribution Module a. Remove four 5/16” nuts securing heat sink and PCBA board to housing (rubber washer, star washer and nut). Use flexible or 90 degree angle tool to remove top left nut. b. Remove PDM board with heat sink. 16. Install new PDM board assembly. 17. Secure to housing by reconnecting four nuts including rubber washer and star washer using 5/16” socket. Tighten to 45 in-lbs of torque. 18. Reinstall ECM Power Board. a. Reinstall the mounting nuts and screws to the DC Bus cables. Use the 45 in- lbs torque drive to tighten the nuts. DO NOT over tighten. 440036-001 Rev A (December 2002) Page 2 of 4 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Work Instructions Power Distribution Module (PDM) Replacement Capstone Model C60 MicroTurbine

PDF Search Title:

Work Instructions Power Distribution Module (PDM) Replacement Capstone Model C60 MicroTurbine

Original File Name Searched:

440036_PDM.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)