PDF Publication Title:
Text from PDF Page: 002
Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Work Instructions: Dump Valve Replacement – Model C60 MicroTurbine Required Tools 10mm Socket 9/16” Socket 1⁄4” 12 point Socket Two 2” adjustable wrenches Nickel-based Anti-Seize Compound Gas Leak Detector Procedures 1. Ensure the MicroTurbine system is in the standby state. 2. Remove all power sources and fuel supply from the MicroTurbine system. 3. Allow engine to cool for at least three (3) hours. 4. Remove the top MicroTurbine side panels. 5. Disconnect the Dump Valve harness from the Engine harness. 6. Remove two 9/16” nuts holding the mounting bracket to dump valve. 7. Remove four 1/4” 12pt bolts holding dump valve tubing to engine. Remove tubing with dump valve from package for easier replacement. 8. Using two adjustable wrenches, remove tubing from dump valve. 9. Remove Dump valve. 10. Install new dump valve. 11. Reconnect tubing to dump valve. 12. Secure dump valve tubing to engine. Use Nickel based anti-seize on the threads of the bolts. 13. Secure the dump valve to the chassis mounting bracket using the 9/16” socket. 14. Reconnect the dump valve harness to the Engine harness. 15. Reconnect fuel and power supply. 16. Initiate engine start. 17. Verify system is free of leaks using leak detector or soapy water. 18. Test the system for proper operation as detailed in the MicroTurbine User’s Manual. Responsibility It is the responsibility of Capstone to make these procedures available to the Authorized Service Providers so they can successfully complete this task. It is the responsibility of the Authorized Service Providers to read this document, understand its contents, and effectively complete the replacement procedures. 440048-001 Rev A (December 2002) Page 2 of 2 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Work Instructions Dump Valve Replacement Capstone Model C60 MicroTurbine
PDF Search Title:
Work Instructions Dump Valve Replacement Capstone Model C60 MicroTurbineOriginal File Name Searched:
440048_Dump_Valve.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |