logo

Work Instructions BCM Power Board Replacement Capstone Model C60 MicroTurbine

PDF Publication Title:

Work Instructions BCM Power Board Replacement Capstone Model C60 MicroTurbine ( work-instructions-bcm-power-board-replacement-capstone-model )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 002

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Work Instructions: BCM Power Board Replacement – Model C60 MicroTurbine Required Tools 􏰪 10 mm socket 􏰪 Torque Wrench 􏰪 #2 Phillips screwdriver 􏰪 #3 Phillips screwdriver 􏰪 Flathead screwdriver Procedures 1. Ensure the MicroTurbine system is in the standby state. 2. Remove all power sources and fuel supply from the MicroTurbine system. 3. Remove the MicroTurbine right side panel. 4. Remove BCM cover. 5. Disconnect all communication cables from Hybrid Control Board (HCB). J7 BCM Pre-Charge Contactor, J1 Main IGBT, J6 Intra BCM, J4 Battery PM, J5 Fan Inv, and J3 Voltage Sense. 6. Remove HCB with mounting plate using #2 Phillips screwdriver. 7. Disconnect battery pack from E3 Batt+ using a flathead screwdriver. 8. Remove BCM Power Board cables. a. J1 Voltage Sense and J2 Fan Inv. b. E1 Bus+ and E2 Bus- using 10mm socket. c. E7 Batt- using 10mm socket. 9. Disconnect BCM Power Board from IGBT module by removing three #3 Phillips screws and three 10mm bolts. 10. Remove two Phillips screws holding the capacitor mounting plate to the housing at the rear of the package using #2 Phillips screwdriver. 11. Remove BCM Power Board. 12. Install new BCM Power Board. 13. Reconnect BCM Power Board to IGBT module. Verify connections are tightened to 45 in-lbs. 14. Reconnect cable connections to BCM Power Board. 15. Reconnect E1 Bus+ and E2 Bus- to BCM Power Board. Tighten to 45 in-lbs. 16. Reinstall HCB and mounting plate. 17. Reconnect cables to HCB. 12. Turn on power and fuel supply. 13. Test the system for proper operation as detailed in the MicroTurbine User’s Manual. 440042-001 Rev A (December 2002) Page 2 of 4 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Work Instructions BCM Power Board Replacement Capstone Model C60 MicroTurbine

work-instructions-bcm-power-board-replacement-capstone-model-002

PDF Search Title:

Work Instructions BCM Power Board Replacement Capstone Model C60 MicroTurbine

Original File Name Searched:

440042_BCM_Power_Board.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP