logo

LCM IGBT Replacement Capstone Model C60 MicroTurbine

PDF Publication Title:

LCM IGBT Replacement Capstone Model C60 MicroTurbine ( lcm-igbt-replacement-capstone-model-c60-microturbine )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 002

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Work Instructions: LCM IGBT Module Replacement – Model C60 MicroTurbine Required Tools 􏰪 10mm Socket 􏰪 #2 Phillips screw driver 􏰪 #3 Phillips screw driver 􏰪 1⁄2“ socket Procedures 1. Ensure the MicroTurbine system is in the standby state. 2. Remove all power sources and fuel supply from the MicroTurbine system. 3. Remove the MicroTurbine right side panel. 4. Remove fourteen #2 Phillips screws from LCM package to remove LCM cover. 5. Disconnect Cables J7 BCM pre-charge, J1 Main IGBT, and J6 Inter LCM from HCB. 6. Disconnect ribbon cable from Neutral IGBT. 7. Remove Hybrid Control Board (HCB) with Mounting Plate by removing three #3 Phillips screws. 8. Remove LCM Power Board. 1. Disconnect LCM Power Board cables. a. J1 Voltage Sense and J2 Phase Voltage. b. E1 Bus+ and E2 Bus- connections using 10mm socket. 2. Disconnect LCM power board from the three-phase IGBT module. a. Remove three #3 Phillips screws. b. Remove three 10mm 6pt nuts. 3. Disconnect the LCM Power Board from the Neutral IGBT module. a. Remove two #3 Phillips screws. b. Remove two 10mm 6pt nuts. 4. Disconnect LCM Power Board assembly from package by removing two #2 Phillips screws at base of capacitor mounting plate at the rear of the package. a. Remove LCM power board assembly (power board, capacitors and mounting plate) 9. Remove IGBT module with heat sink. a. Remove three cables attached to the IGBT module using 1⁄2” socket. b. Remove two IGBT mounting straps, five #2 Phillips screws per strap. c. Remove IGBT module with heat sink. 10. Install new IGBT module. 11. Reconnect cables from inductors to IGBT module. From left to right connections are labeled 1, 3, and 2. Tighten connections to 80 in-lbs. 440039-001 Rev A (December 2002) Page 2 of 4 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | LCM IGBT Replacement Capstone Model C60 MicroTurbine

lcm-igbt-replacement-capstone-model-c60-microturbine-002

PDF Search Title:

LCM IGBT Replacement Capstone Model C60 MicroTurbine

Original File Name Searched:

440039_LCM_IGBT.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP