logo

Commissioning Checklist - MicroTurbines

PDF Publication Title:

Commissioning Checklist - MicroTurbines ( commissioning-checklist-microturbines )

Next Page View | Return to Search List

Text from PDF Page: 001

Capstone Turbine Corporation · 21211 Nordhoff Street · Chatsworth · CA 91311 · USA Telephone: (818) 734-5300 · Fax: (818) 734-5320 · Web: www.microturbine.com Commissioning Checklist - MicroTurbines Upon completion of commissioning of the MicroTurbine, fill out this form, keep a copy for reference, and return the original to Capstone. A separate form must be completed for each commissioned system if not in a MultiPac configuration. Only one completed form is required for each MultiPac configuration. System Serial Number (or MultiPac Serial Numbers): Date: Owner: Location: City: Modem Number: State: IP Address: Operator: Address: Zip Code: Country: Installation Site Contact Phone Number: Site Contact Cell Number: Site Contact e-mail Address: Phone: Inspections Site Contact Name: System Part Number: Site Contact Fax Number: Site Elevation: Site Utility Account Representative: Mechanical Inspection 1. Is there adequate drainage around the MicroTurbine to prevent standing water? Circle: Y N 2. Model 330 Standard Package - Is the MicroTurbine installed on a surface that allows the cart to be rolled out? Circle: Y N 3. Clearances: • Model 330 Standard Package - When the cart is rolled out, is there adequate room to access all components, including rolling the cart out far enough to get into the enclosure behind the cart if necessary? Circle: Y N (Recommended clearances in mm/in: Front - 1575/62 Side - 1067/42 Rear - 914/36.) • Model 330 Industrial Package - Is there adequate clearance to remove the panels to access all components, including access to the front and the rear of the system? (Recommended clearances in mm/in: Front - 914/36 Side - 1067/42 512903-001rA (Jan 2002) 1 of 13 Circle: Y N Rear - 914/36.) Commissioning Checklist This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the equipment specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Commissioning Checklist - MicroTurbines

commissioning-checklist-microturbines-001

PDF Search Title:

Commissioning Checklist - MicroTurbines

Original File Name Searched:

CommissioningChecklist.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP