logo

440092_Frame PM

PDF Publication Title:

440092_Frame PM ( 440092_frame-pm )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 003

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Work Instructions: Frame (System) PM Replacement – C30 MicroTurbine Unclip the cable from the PM Step # 2 Remove the two screws P/N 508566-036 with #1 Phillips screwdriver, remove the PM Step #3 Frame (System) PM (P/N 503010-100) (Blue) Figure 3. Open SIP Frame PM Figure 4. Open Cart Frame PM CAUTION Before replacing Frame (System) PM note all system settings from the Display Panel or from the CRMS as system settings will be lost when PM is removed. Note UCB settings, control settings, grid connect and stand alone settings as they will need to be reloaded after installing the new PM. 2. Unclip the cable from the PM. Refer to Figures 1, 3 and 4 as required. 3. Remove the two PM screws with #1 Phillips screwdriver to remove the PM. 4. Replace the PM module P/N 503010-100 using the 2 screws P/N 508566-036. 5. Reattach the frame PM cable. 6. Check the configuration using CRMS or the Display Panel. The PM configuration should match the frame (system) PM serial bar code at the back of the package. See Figure 2. 7. Reprogram the PM if necessary per CRMS instructions. A 4011 software compatibility fault will be reported if software does not match the device or code set. 440092-001 Rev A (February 2004) Page 3 of 4 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. NOTE The Personality Module (PM) is not programmed from Capstone. Program the PM for the frame (system) PM. NOTE

PDF Image | 440092_Frame PM

440092_frame-pm-003

PDF Search Title:

440092_Frame PM

Original File Name Searched:

440092_Frame PM.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP