logo

Technical Reference Capstone MicroTurbine Electrical Installation

PDF Publication Title:

Technical Reference Capstone MicroTurbine Electrical Installation ( technical-reference-capstone-microturbine-electrical-install )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 020

Capstone Turbine Corporation  21211 Nordhoff Street  Chatsworth  CA 91311  USA Technical Reference: Capstone MicroTurbine Electrical Installation Figure 13. Connection to Non-480V Wye Service – Autotransformer with Floating Neutral 5. Standalone Mode 5.1. Output and Load Specification The microturbine output consists of three phases and a neutral. The current in each phase need not be balanced, as long as the electrical current limits per phase are respected. Loads may be connected phase-phase or phase-neutral. The nominal Stand Alone voltage setting is available between any two phases.. For current and voltage specifications of each microturbine model, refer to the Electrical Specification documents referenced in Table 1. 5.2. Phase Sequence For SA installations, the output phase rotation sequence is L1 to L2 to L3. Notice that improper phase connections can damage the connected loads or cause microturbine trips. Capstone cannot be held responsible for equipment damage caused by improper connections. It is the installer’s responsibility to verify the proper phase connections between the microturbine and the load(s). 5.3. Transformers for Highly Non-Linear Loads For any SA installation with highly non-linear loads, an isolation transformer is required. This transformer functions as a harmonic filter and provides additional benefits for motor starting and kVA margin. Highly non-linear loads are defined as:  Any loads causing the site current THD to be greater than 8% 410009 Rev F (October 2013) Page 20 of 31 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Technical Reference Capstone MicroTurbine Electrical Installation

technical-reference-capstone-microturbine-electrical-install-020

PDF Search Title:

Technical Reference Capstone MicroTurbine Electrical Installation

Original File Name Searched:

410009F_TR_ELECTRICAL_INSTALLATION.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP