CAPSTONE GAS PACK INSTALLATION PROCEDURE

PDF Publication Title:

CAPSTONE GAS PACK INSTALLATION PROCEDURE ( capstone-gas-pack-installation-procedure )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 012

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Capstone Gas Pack: Installation Procedure CAUTION MICROTURBINE REAR VIEW When drilling holes in the MT rear panel, use care to not damage the cable assemblies that are behind the panel. 3. If holes are not already provided in the MT rear panel, drill the holes as follows: a. Locate and mark the 32-3/8” vertical distance on the left and right sides on the back of the MT (see Figure 4). Use other dimensions as reference. THREE HOLES UCB EACH SIDE Figure 4. Drilling Hole Locations on the Back of the MicroTurbine b. UsingtheMountingFrameasatemplate(seeFigure5),alignthetwo upper mounting holes with the 32-3/8” line. Make sure the mounting frame is at equal distances from right and left edges of MT, and mark the locations of the six holes. c. Remove the side panels from the MicroTurbine. d. Carefully drill six holes in the rear panel using size 11/32 drill bit. Place a block of wood or other material between the panel and the cable assemblies to prevent drilling into the cable assemblies. 480018 Rev C (March 2008) Page 12 of 31 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. 1.25 IN. 12.00 IN. 32-3/8 IN. 2.75 IN.

PDF Image | CAPSTONE GAS PACK INSTALLATION PROCEDURE

PDF Search Title:

CAPSTONE GAS PACK INSTALLATION PROCEDURE

Original File Name Searched:

480018C_AG_GASPACK_INSTALL_PROC.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)