logo

CAPSTONE GAS PACK INSTALLATION PROCEDURE

PDF Publication Title:

CAPSTONE GAS PACK INSTALLATION PROCEDURE ( capstone-gas-pack-installation-procedure )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 004

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Capstone Gas Pack: Installation Procedure LIST OF FIGURES Figure 1. Single MicroTurbine with Gas Pack and Extension (Skirt)............................................6 Figure 2. Dual MicroTurbine Installation Including the Fuel Trains............................................... 6 Figure 3. Gas Pack on Shipping Crate Pallet..............................................................................10 Figure 4. Drilling Holes on Back of MicroTurbine ........................................................................ 12 Figure 5. Installing Mounting Frame to MicroTurbine.................................................................. 13 Figure 6. Lifting the Gas Pack......................................................................................................14 Figure 7. Utility Conduit Routing Inside AC Gas Pack ................................................................ 15 Figure 8. Utility AC Connections inside Gas Pack ...................................................................... 16 Figure 9. Wiring Diagram between AC Gas Pack and UCB....................................................... 16 Figure 10. Conduit Routing at the Back of Gas Pack ................................................................. 17 Figure 11. HRM Rain Hood..........................................................................................................17 Figure 12. Installing Gas Pack on Mounting Frame....................................................................18 Figure 13. Routing Conduits through Gas Pack Mounting Frame ............................................. 18 Figure 14. View of HRM Showing Rain Hood and Drain Pipe.................................................... 19 Figure 15. Installing Fuel Outlet Kit .............................................................................................. 20 Figure 16. Installing Fuel Inlet Kit.................................................................................................21 Figure 17. Installing Fuel Outlet Kit - Dual MicroTurbine ............................................................ 21 Figure 18. Connecting Conduit with 3 Wires to UCB (without Precharge).................................23 Figure 19. Wiring Between DC Gas Pack and UCB (without Precharge)..................................24 Figure 20. Connecting Conduit with 3 Wires to UCB (with Precharge)......................................25 Figure 21. Installing Conduit with 4 Signal Wires to Bottom of UCB .......................................... 26 Figure 22. Connectors J12 and J15 on UCB Board.................................................................... 27 480018 Rev C (March 2008) Page 4 of 31 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | CAPSTONE GAS PACK INSTALLATION PROCEDURE

capstone-gas-pack-installation-procedure-004

PDF Search Title:

CAPSTONE GAS PACK INSTALLATION PROCEDURE

Original File Name Searched:

480018C_AG_GASPACK_INSTALL_PROC.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP