ADVANCED POWER SERVER (APS) INSTALLATION SPECIFICATION

PDF Publication Title:

ADVANCED POWER SERVER (APS) INSTALLATION SPECIFICATION ( advanced-power-server-aps-installation-specification )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 011

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Advanced Power Server (APS): Installation Specification Power Connections WARNING All sources of electrical power to the APS cabinet MUST BE isolated prior to opening the cabinet door. Power Requirements 120 VAC or 220 VAC depending on model (80 watts nominal operational usage). Cable Requirements Cable parameters include the following items: • All UPS power wires must be 10 to 24 AWG. • The torque for the screw connector shall be 5.5 in-lb. • Capstone recommends using UL weatherproof metallic grounded conduits for all power and signal wiring connections. • External AC power wiring with ground wire should be minimum 14-gauge stranded. Conduit should be grounded to enclosure and source chassis, hardwired into power source, with no disconnectable power plugs. All work shall comply with local and national codes. • The cable length from the APS to Dual Mode Controller (DMC) must be 500 feet or less for both cases (with or without Annunciator Panel). CAUTION Signal and power wiring must be routed in separate grounded conduits. Figure 7 shows the input power connections to the UPS device. UPS Ground Neutral Line Figure 7. Input Power Connections 480024 Rev A (June 2007) Page 11 of 26 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | ADVANCED POWER SERVER (APS) INSTALLATION SPECIFICATION

PDF Search Title:

ADVANCED POWER SERVER (APS) INSTALLATION SPECIFICATION

Original File Name Searched:

480024_APS_Installation_Spec.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)