PDF Publication Title:
Text from PDF Page: 012
17007 CHP MTR OC BYP (Continued) Symptom Probable Cause Analysis Repair Solution Water temperature high. MicroTurbine shuts down (Continued) Linkage/Diverter failure (Continued) 9. Remove HRM roof assembly panel and inspect diverter for deformation (diverter should be straight) or foreign objects. If diverter is not straight or foreign object exists, go to 10. 10. Replace diverter assembly or remove foreign object (Check step 8 again) - reconnect push-rod assembly, diverter link, bell crank, and linear actuator. Restart the unit. If the fault is cleared, the problem is solved. If the fault still exists, go to 12. 11. Replace push-rod assembly - reconnect push-rod assem- bly, diverter link, bell crank, and linear actuator. Restart the unit. If the fault is cleared, the problem is solved. If the fault still exists, go to 12. 12. Replace linear actuator - reconnect push-rod assembly, diverter link, bell crank, and linear actuator. Restart the unit. If the fault is cleared, the problem is solved. If the fault still exists, go to 13. CHP Control Board failed 13. Troubleshoot the CHP Control Board as explained under the 17000 fault code. Observe Safety Precautions - Refer to Safety Instructions for Details 430013-001 Rev C (July 2003) 14-12 Model C60 Troubleshooting Guide This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Overview SERIES 17000 FAULT CODES Integrated CHP Faults
PDF Search Title:
Overview SERIES 17000 FAULT CODES Integrated CHP FaultsOriginal File Name Searched:
14_17000 Faults.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |