Technical Reference Capstone Model C60/C65 Electrical

PDF Publication Title:

Technical Reference Capstone Model C60/C65 Electrical ( technical-reference-capstone-model-c60-c65-electrical )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 020

J11 (1) J11 (2) J11 (3) J11 (4) J11 (5) J11 (6) J11 (7) J11 (8) J11 (9) J12 (1) J12 (2) J12 (3) J12 (4) J12 (5) J12 (6) J12 (7) J12 (8) J12 (9) J12 (10) J12 (11) J12 (12) J12 (13) Chassis Ground DIGINSP AGND OPTO 3 (-) OPTO 3 (+) OPTO 2 (-) OPTO 2 (+) OPTO 3 (-) OPTO 3 (+) To be used for shield connections 0-5 Volt Analog Signal Analog Ground for J11 (2). Impedance =10 ohms Isolated return for J11 (5). Isolated. (150 Volts DC maximum to earth) KVAR Pulse Train from Wattmeter (+5 to +15 Volts, Zin= 1 kohm, Isolated) (150 Volts DC maximum to earth) Isolated return for J11 (7). Isolated. (150 Volts DC maximum to earth) Negative Power Pulse Train from Wattmeter (+5 to +15 Volts, Zin= 1 kohm, Isolated. (150 Volts DC maximum to earth) Isolated return for J11 (9). Isolated. (150 Volts DC maximum to earth) Positive Power Pulse Train from Wattmeter (+5 to +15 Volts, Zin= 1 kohm, Isolated. (150 Volts DC maximum to earth) Capstone Turbine Corporation  21211 Nordhoff Street  Chatsworth  CA 91311  USA Technical Reference: Capstone C60/C65 Electrical Table 11. Connector J11 – Opto-Isolated Inputs from Wattmeter Pin Signal Parameter Table 12. Connector J12 – Contact Closure Inputs Pin Signal Parameter Chassis Ground SA (Stand Alone mode) GC (Grid Connect mode) Start/Stop AGND FLT1 (User Fault Input) FLT2 (User Fault Input) AGND KVAR (-) (Wattmeter) KVAR (+) (Wattmeter) PWR (-) (Wattmeter) PWR (+) (Wattmeter) AGND To be used for shield connections Dry circuit closure to AGND from (+) 5 Volt pull up, 4.7 k ohms (Note 1) Dry circuit closure to AGND from (+) 5 Volt pull up, 4.7 k ohms Dry circuit closure to AGND from (+) 5 Volt pull up, 4.7 k ohms (Note 1) Return circuit for connector J12 contact closures (Note 1) Dry circuit closure to AGND from (+) 5 Volt pull up, 4.7 k ohms (Note 1) Dry circuit closure to AGND from (+) 5 Volt pull up, 4.7 k ohms (Note 1) Return circuit for connector J12 contact closures (Note 1) Dry circuit closure to AGND from (+) 5 Volt pull up, 4.7 k ohms (Note 1) Dry circuit closure to AGND from (+) 5 Volt pull up, 4.7 k ohms (Note 1) Dry circuit closure to AGND from (+) 5 Volt pull up, 4.7 k ohms (Note 1) Dry circuit closure to AGND from (+) 5 Volt pull up, 4.7 k ohms (Note 1) Return circuit for connector J12 contact closures (Note 1) Note 1: Connections made to these terminals MUST be Dry Circuit rated and isolated from ground/chassis. They may not be connected in parallel with other MicroTurbine input terminals. 410001 Rev K (June 2009) Page 20 of 22 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Technical Reference Capstone Model C60/C65 Electrical

PDF Search Title:

Technical Reference Capstone Model C60/C65 Electrical

Original File Name Searched:

C60_C65_Elect_Tech_Ref1.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)