PDF Publication Title:
Text from PDF Page: 025
10037 Internal Fault IDSP PRECHARGE Inverter Failed to Precharge System Severity Level 4 In Grid Connect operation, the software declares a Fail to Precharged fault if the DC Bus is not precharged by the end of the Grid Synchronization Timeout Time. Symptom Probable Cause Analysis Repair Solution In Grid Connected operation, the DC Bus is not pre-charged by the end of the Grid Synchronization Timeout period. Open/loose connection Open the LCM cover and check if the wires between the line-filter & pre-charge board. Tighten cable connections The pre-charge resistors are burnt. Open the LCM cover and check the condition of the pre- charge resistors. Replace the line-filter & precharge board. The control parameter of Grid Synchronization Timeout is wrongly set. Make sure that the LCM Control Board and System PM’s are programmed properly, and it is supported by the installed control software. Re-program the LCM Control Board PM. Faulty LCM Control Board Circuitry on LCM Control Board has failed Attempt a LCM Control Board PM upload. Replace LCM Control Board. Faulty LCM Power Board Circuitry on LCM Power Board has failed. Attempt a LCM Control Board PM upload. Replace LCM Power Board. Observe Safety Precautions - Refer to Safety Instructions for Details 430013-001 Rev C (July 2003) 11-25 Model C60 Troubleshooting Guide This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Overview SERIES 10000 FAULT CODES Inverter Faults
PDF Search Title:
Overview SERIES 10000 FAULT CODES Inverter FaultsOriginal File Name Searched:
C60_11_10000 Faults.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)