PDF Publication Title:
Text from PDF Page: 017
Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Dual Mode Controller (DMC): User’s Manual MicroTurbine Software Settings NOTE If the DMC is connected to an Advanced Power Server (APS): 1. For software-related information, refer to the APS User’s Manual (400011) for details on APS-CRMS software set up of logical input/output assignments associated with the DMC, in the sections entitled APS-CRMS Computer Software Program and Appendix 2. 2. For hardware-related information, refer to the APS Installation Specification (480024), in the section entitled Digital Input/Output Connections, for information on the DMC control signal connections. The following nine software settings need to be configured on the C30/C60/C65 MicroTurbine when it • • • • • • • • • is connected to a DMC, with exceptions as noted: Power Connect Auto Restart Grid Reconnect Delay (Does not apply to C30, or C60 software v4.3X and lower) Grid Reconnect toggle (Manual/Auto) (Does not apply to C30, or C60 software v4.3X and lower) SA Load Wait (Available in CRMS version 4.5X and higher) (Does not apply to C30, or C60 software v4.3X and lower) SA Fast Transfer Delay (Available in CRMS version 4.5X and higher) (Does not apply to C30, or C60 software v4.3X and lower) Auto Enable Power Start Input Output Relay settings These can be accomplished using CRMS or the Display Panel on the MicroTurbine. Refer to Capstone Remote Monitoring System – User Edition (410013) for instructions to use CRMS. Refer to the MicroTurbine User’s Manual (400001 for C30/C60 and 400017 for C65 with 5.XX software) for instructions to use the Display Panel. Power Connect Use CRMS or the Display Panel to set Power Connect to Dual Mode. The default setting for Power Connect is Grid Connect. Auto Restart Use CRMS or the Display Panel to set Auto Restart to Enable (YES [1] on the Display Panel). The default setting for Auto Restart is Disable (NO [0] on the Display Panel). Grid Reconnect Delay Use CRMS or the Display Panel to enter a value in the range of 5 to 30, in minutes, for the Grid Auto Reconnect Delay time. The default, and minimum, value is 5. This option does not apply to the C30 model, or to the C60 model with software version 4.3X and lower. 400009 Rev A (May 2008) Page 17 of 21 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | DUAL MODE CONTROLLER (DMC) USER’S MANUAL
PDF Search Title:
DUAL MODE CONTROLLER (DMC) USER’S MANUALOriginal File Name Searched:
400009A_DMC_Users_Manual.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |