logo

Capstone MicroTurbine Model C65 User's Manual

PDF Publication Title:

Capstone MicroTurbine Model C65 User's Manual ( capstone-microturbine-model-c65-users-manual )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 049

Capstone Turbine Corporation Model C65 User’s Manual In a MultiPac, the Stored Demand setting for the MultiPac is changeable and viewable from the master microturbine only. Each microturbine has its own, permanently saved, Stored Demand setting, even when it is configured as a MultiPac-enabled slave. However, a microturbine operating as a MultiPac-enabled slave will only display its fractional portion of the total power demand at the Stored Demand submenu. Also, an individual microturbine’s Stored Demand setting cannot be changed at its Stored Demand submenu if it is configured as a MultiPac-enabled slave. NOTE: The primary Grid Connect Protective Relay function is to ensure that the microturbine does not energize utility wires de-energized by the utility. 4.6.2. Under Voltage Submenu ELECTRICAL WARNING: Protective Relay settings can only be changed by a Capstone Authorized Service Provider (ASP) using CRMS. Do not attempt to change any Grid Connect Protective Relay functions yourself. Injury to personnel and/or damage to equipment can occur. Grid Connect 2/4 Under Voltage 2/10 422 Vrms 2.00 Sec NOTE: The Under Voltage submenu is read only, and no settings can be changed using the display panel. Protective relay settings can only be changed by an Authorized Service Provider using CRMS. The Under Voltage submenu shows the line-to-line voltage trip point and associated delay time. If the RMS voltage between any phases falls below this setting, the delay timer is started. If the voltage has not recovered at the end of this time, the system will shut down. This is adjustable from 352 up to the Over Voltage setpoint in 1 Volt increments. Initial factory setting is 422 VAC line-to-line. Under Voltage Delay establishes the time allowed for any phase voltage to fall below the Under Voltage limit. The delay is adjustable from 0.01 up to 300 seconds in 0.01 second increments. Initial factory setting is 2.0 seconds. This setting can only be changed by a Capstone ASP using CRMS. 400017 Rev C (February 2013) Page 49 of 69 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Capstone MicroTurbine Model C65 User's Manual

capstone-microturbine-model-c65-users-manual-049

PDF Search Title:

Capstone MicroTurbine Model C65 User's Manual

Original File Name Searched:

400017C_UM_C65_IND_PKG.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP