PDF Publication Title:
Text from PDF Page: 058
Capstone Turbine Corporation Model C65 Hybrid UPS User’s Manual 5.7.6. Over Frequency Submenu Load Output 3/4 Over Frequency 6/8 65.0 Hz 10.00 Sec The Over Frequency submenu shows the system over frequency set point and associated delay time. If the output frequency rises above this over frequency trip point for the set delay time, the system will shut down. The frequency is adjustable from 65 Hz down to the nominal output frequency, in 0.1 Hz increments. Initial factory setting is 65 Hz. If the output frequency exceeds the Over Frequency setting for the time delay setting, the system will shut down. The time delay is adjustable from 0.01 to 10 seconds in 0.01 second intervals. Initial factory setting is 10 seconds. Note that the output frequency is synchronized with the input utility grid during normal operation. Therefore, the Load Output over frequency setpoints should be greater than the Utility Input over frequency setpoints to assure coordinated response to utility frequency shifts. This setting can only be changed by a Capstone ASP using CRMS. 5.7.7. MultiPac Minimum Power Submenu Load Output 3/4 MP Min Power 7/8 30.0 kW 3600 Sec MultiPac Minimum Power submenu shows the minimum power level that a group of Hybrid UPS systems must be able to provide before they switch their load outputs on. The settings cannot be set changed from this submenu, and should be set during commissioning by a Capstone Authorized Service Provider. The kW setting is the minimum value of total power available from the MultiPac of Hybrid UPS systems before the master commands them into Load State and begins outputting power to the critical load. This setting ensures that the system has enough power output capability before power is allowed to be exported to the load, and should be set to the maximum expected load. Initial Factory Setting is 0 kW. The timeout period setting establishes the maximum time the MultiPac has to achieve the minimum power setting before the system shuts down automatically. This timeout setting is adjustable from 60 to 3600 seconds in 1 second intervals. Initial Factory Setting is 3600 seconds. Page 58 of 71 400027 Rev B (August 2013) Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. CAUTION: Adjusting the Load Output over frequency setting below the Utility Input under frequency setting may result in the Hybrid UPS system disconnecting power from the critical load when the Utility grid frequency increases. Only adjust the Load Output over frequency to a value greater than the Utility Input over frequency setting. NOTE: The Over Frequency submenu is read only, and no settings can be changed using the display panel. Protective Relay settings can only be changed by an Authorized Service Provider using CRMS.PDF Image | Capstone MicroTurbine Model C65 Hybrid UPS User's Manual
PDF Search Title:
Capstone MicroTurbine Model C65 Hybrid UPS User's ManualOriginal File Name Searched:
400027B_UM_C65_HYBRID_UPS.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |