logo

Capstone MicroTurbine Model C200 User's Manual

PDF Publication Title:

Capstone MicroTurbine Model C200 User's Manual ( capstone-microturbine-model-c200-users-manual )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 049

Capstone Turbine Corporation Model C200 User’s Manual 4.6.7. Over Frequency Submenu Grid Connect 2/4 Over Frequency 7/9 60.5 Hz 0.16 Sec NOTE: The Over Frequency submenu is read only, and no settings can be changed using the display panel. Protective relay settings can only be changed by an Authorized Service Provider using CRMS. The Over Frequency submenu shows the system over frequency trip point and associated delay time. If the grid frequency exceeds this over frequency trip point for the set delay time, the system will shut down. The frequency is adjustable from the Under Frequency setting to 65, in 0.1 Hz increments. Initial Factory Setting is 60.5 Hz. The Over Frequency Delay is the number of seconds allowed for the Over Frequency condition before the system shuts down. This is adjustable from 0 to 10 in 0.01 second increments. Initial Factory Setting is 0.16 second. This setting can only be changed by a Capstone ASP using CRMS. 4.6.8. Enable Mode Submenu The Enable Mode submenu applies only to Dual Mode configured systems. The display shows whether the system will transition back to Grid Connect Mode manually (manual) or automatically (auto) with this setting. 4.6.9. Reconnect Delay Submenu The Reconnect Delay submenu applies only to Dual Mode configured systems. After a transition to Stand Alone, the turbine checks that the utility grid voltage is within the protective relay settings for this time limit before reconnecting to the grid. It is the minimum amount of time the system will operate in the Hot Standby state. In Hot Standby, the engine is on and ready to generate power in Stand Alone mode if the utility grid loses power during the delay period. The initial factory setting for Reconnect Delay is 5 minutes. The timer can be set from 5 to 30 minutes. 400008 Rev G (October 2013) Page 49 of 64 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. Grid Connect 2/4 Enable Mode 8/9 AUTO Grid Connect 2/4 Reconnect DLY 9/9 5.0 Min

PDF Image | Capstone MicroTurbine Model C200 User's Manual

capstone-microturbine-model-c200-users-manual-049

PDF Search Title:

Capstone MicroTurbine Model C200 User's Manual

Original File Name Searched:

400008G_UM_C200_IND_PKG.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP