logo

Capstone MicroTurbine Model C200 User's Manual

PDF Publication Title:

Capstone MicroTurbine Model C200 User's Manual ( capstone-microturbine-model-c200-users-manual )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 034

Capstone Turbine Corporation Model C200 User’s Manual d. Navigate to the Turbine Number third-level menu. e. Press the “1” Numeric Keypad button to set the Turbine Number to 1; then press the ACCEPT button. 3. Enable MultiPac from the new master unit a. Go to the System Data top-level menu. b. Navigate to the System Configuration second-level menu. c. Navigate to the MultiPac third-level menu. d. Use the (+) or (-) buttons to select Enable, then press the ACCEPT button. 4. Reboot the new master unit a. Go to the System Data top-level menu. b. Navigate to the Reboot second-level menu. Use the (+) or (-) buttons to select Yes, then press the ACCEPT button. c. If there had been a telephone line connected to the modem in the original master unit, move the telephone line connection to the modem in the new master unit. d. If there are any other cables (e.g., from a power meter or a global E-Stop device) connected to the original master unit, also move these connections from the original to the new master unit. 5. At this point, the microturbine that had been the original master unit is not part of the MultiPac. To include it in the MultiPac, continue with these steps on its display panel. a. Go to the System Data top-level menu. b. Navigate to the System Configuration second-level menu. c. Navigate to the Turbine Number third-level menu. d. Use the Numeric Keypad to set the Turbine Number to a unique value; then press the ACCEPT button. e. Navigate to the MultiPac third-level menu. Use the (+) or (-) buttons to select Enable, then press the ACCEPT button. 3.6. Hazardous Location Operation Refer to the C200 Hazardous Location Application Guide (480047) for details about hazardous location operation. For hazardous location applications, the Capstone hazardous location controller is used to monitor and control the operation of the microturbine, and the UCB is not available for user connections. Page 34 of 64 400008 Rev G (October 2013) Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. HIGH VOLTAGE WARNING: Some connections require that the entire system be de-energized in order to be moved safely. To prevent injury to personnel or damage to equipment, completely remove power from the original and new master units, and from the connected equipment, before moving any cables.

PDF Image | Capstone MicroTurbine Model C200 User's Manual

capstone-microturbine-model-c200-users-manual-034

PDF Search Title:

Capstone MicroTurbine Model C200 User's Manual

Original File Name Searched:

400008G_UM_C200_IND_PKG.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP