logo

C60 2002 User Manual

PDF Publication Title:

C60 2002 User Manual ( c60-2002-user-manual )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 037

Capstone MultiPac Redundancy Capstone Turbine Corporation MicroTurbine Userís Manual In MultiPac operation, if an individual MicroTurbine fails (shuts down due to a fault), the remaining units will continue to operate. If the master unit fails and communication is not possible, the entire MultiPac system will shut down. If the master unit fails, another unit in the MultiPac system can be manually programmed to be the new master unit (the MultiPac system must not be operating while this re-configuration is performed). MultiPac Enable/Disable Individual MicroTurbines must be disabled from a MultiPac system for service and maintenance. When service or maintenance is completed, the individual MicroTurbines must be added back into the MultiPac system (i.e., re-enabled). For data on the steps to Enable/Disable a MicroTurbine unit in a MultiPac system, refer to the Display Panel Menu Screens section on the top-level System Data Menu and the System Configuration Submenu, or contact your Capstone Authorized Service Provider. Changing the Master Unit in a MultiPac In a MultiPac system, one MicroTurbine is the master unit. To assign a different MicroTurbine to be the master unit, perform the following steps. The steps are presented in functional groups of steps for clarity. • Disable the old Master from the MultiPac 1. Log on with the User Password (see Logging On with a Password on page 21). 2. Go to the System Data top-level menu. 3. Navigate to the System Configuration second-level menu. 4. Navigate to the MultiPac third-level menu. 5. Use the (+) or (-) buttons to select Disable; then press the ACCEPT button. The following steps are performed on the Display Panel of the MicroTurbine that will be the new master unit in the MultiPac. • Set the MicroTurbine that will be the new master unit to number 1 6. On the new master unit, log on with the User Password (see Logging On with a Password on page 21). 7. Go to the System Data top-level menu. 8. Navigate to the System Configuration second-level menu. 9. Navigate to the Turbine Number third-level menu. 10. Press the "1" Numeric Keypad button to set the Turbine Number to 1; then press the ACCEPT button. 400001-001 Rev A (July 2002) Page 37 of 52 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. NOTE The following steps are performed on the Display Panel of the MicroTurbine that was the old master unit in the MultiPac. Alternatively, comparable steps can be performed using CRMS software on a computer connected to the MicroTurbine User Interface Port. NOTE

PDF Image | C60 2002 User Manual

c60-2002-user-manual-037

PDF Search Title:

C60 2002 User Manual

Original File Name Searched:

400001-Capstone-MicroTurbine-Manual.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP