PDF Publication Title:
Text from PDF Page: 031
Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Stand Alone Operation–Capstone Models C30 and C65 5.3.4. Battery Wakeup The Battery Wakeup requires a momentary (0.1 to 2 sec) contact closure to wake up the microturbine’s internal battery pack. CAUTION: Permanent contact closure (>2 sec) WILL COMPLETELY discharge the battery! The Battery Wake-up can be performed by either local or remote access: • • 5.3.4.1 Local: Battery Wake-up button (BATT START) on the far left of the Display Panel needs to be pushed (for less than or equal to 2 seconds). Remote: Requires a digital input (from BMS or PLC). Cable length is limited to 100 feet. Battery Wakeup C30 Internal Voltage Supply: requires a potential free digital input momentary pulse (0.1 to 2 sec) between terminals TB2, pin 7 and TB2, pin 8. This input uses 3 Vdc from and internal battery on the UCB. See Figure 5 for wiring details. External Voltage Supply: requires a potential free digital input momentary pulse (0.1 to 2 sec) between terminals TB1, pin 1 (+V) and TB1, pin 2 (-V return). This input uses third party supplied voltage (+4 to +15 Vdc). See Figure 6 for wiring details. 5.3.4.2 Battery Wakeup C65 Internal Voltage Supply: requires a potential free digital input momentary pulse (0.1 to 2 sec) between terminals J10, pin 7 (BAT PWR) and J10, pin 3 (+ISO BSTART). J10, pin 4 (–ISO BSTART) needs to be wired to J16, pin 2 (GND) to supply the return voltage. This input uses 12Vdc from and internal battery in the UCB. See Figure 7 for wiring details. External Voltage Supply: requires a potential free digital input momentary pulse (0.1 to 2 sec) between terminals J10, pin 3 (+V) and J10, pin 4 (-V return). This input uses third party supplied voltage (+4 to +15Vdc). See Figure 8 for wiring details. 410028 Rev E (June 2013) Page 31 of 42 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Technical Reference Stand Alone Operation – Capstone Model C30 and C65
PDF Search Title:
Technical Reference Stand Alone Operation – Capstone Model C30 and C65Original File Name Searched:
410028E_TR_C30-C65_STAND_ALONE.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |