logo

Technical Reference Stand Alone Operation – Capstone Model C30 and C65

PDF Publication Title:

Technical Reference Stand Alone Operation – Capstone Model C30 and C65 ( technical-reference-stand-alone-operation-–-capstone-model-c )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 025

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Stand Alone Operation–Capstone Models C30 and C65 4.2.3. Microturbine Display Panel The MultiPac settings at the microturbine display panel shown below are described in the following paragraphs. Microturbine Display Panel Description Value Default System Data System Configuration MultiPac Enables or disables MultiPac configuration Disable/Enable Disable System Data System Configuration Turbine No. Select a unique numerical identifier for MultiPac configuration 1–20 0 Stand Alone MP Min Power Set minimum power that must be satisfied before MultiPac Load operation will commence in Stand Alone mode. Set maximum amount of time to wait until minimum power is established. Master turbine declares a fault if the minimum time setting has been exceeded. 0 – 2,000,000,000 W 0–3600sec 0 0 4.2.3.1 • Assign MultiPac Turbine Numbers (Turbine = 2-20) Display Panel: Enter the user password (default is 87712370) and navigate to System Data > System Configuration > MultiPac, and select ENABLE. From the System Configuration submenu navigate to Turbine No. and enter a unique turbine identifier. Navigate to Stand Alone > MP Min Power and enter minimum power and minimum power timeout values. Assign a MultiPac turbine number for each subordinate microturbine (other than the master) as follows: • Enter the user password (default is 87712370). • Navigate to System Data > System Configuration > MultiPac, and select DISABLE. From the System Configuration submenu navigate to Turbine No. and enter a unique turbine identifier (2-20). Then navigate to MultiPac again and select ENABLE. • C65 Microturbine: Navigate to System Data > Reboot and select YES to reboot the microturbine. • C20 Microturbine: Navigate to System Settings > Reboot and select YES to reboot the microturbine. 410028 Rev E (June 2013) Page 25 of 42 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Technical Reference Stand Alone Operation – Capstone Model C30 and C65

technical-reference-stand-alone-operation-–-capstone-model-c-025

PDF Search Title:

Technical Reference Stand Alone Operation – Capstone Model C30 and C65

Original File Name Searched:

410028E_TR_C30-C65_STAND_ALONE.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP