logo

TECH REF C30 Grid Connect Op

PDF Publication Title:

TECH REF C30 Grid Connect Op ( tech-ref-c30-grid-connect-op )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 016

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Grid Connect Operation – Capstone Models C30 and C60/C65 Auto Restart Enabling Auto Restart allows the system to automatically attempt a restart after an incident-driven shutdown. If Auto Restart is ON, the system will attempt to restart after most system shutdown modes. This feature may be enabled with any of the listed dispatch modes. Capstone recommends enabling Auto Restart to increase system availability, deliver faster power output and reduce wear on the bearings. If the Auto Restart feature is enabled, the system stores the ON command even through a loss of Operator intervention may be required to manually restart the system if a fault condition occurs and the related protective relay interval is exceeded. The MicroTurbine must be explicitly commanded ON for automatic operation to be enabled. Enter a Restart Delay time to provide the additional time required between start attempts for any connected external devices. • CRMS: From the menu, select: Settings > Control Settings, and set Auto Restart to ENABLE. If a time delay is required before restarting the MicroTurbine, enter the delay time in the Auto Restart Delay – Grid Connect field. • Display panel: Select Auto Restart mode - System Data > System Configuration >Auto Restart, and then select ON. Auto Restart Allows the system to restart itself after a No No electric utility (grid) interrupt Yes Selectarestartdelaytime-GridConnect>RestartDelay,andenteratimeperiod. Restart Delay Sets the time period after restart that 0 – 60 min 0 MicroTurbine powers up. MultiPac Power In MultiPac mode, MicroTurbines can be installed in groups of up to 20 units (100 units with the optional Capstone PowerServer) to operate as a single power generation source. The electric utility grid transmits control signals locally to the MultiPac configuration, activating as many MicroTurbines as required to meet the required power demand. Individual MicroTurbines share power and load on both a dynamic and steady state basis. Refer to the MultiPac Technical Reference (410032) for information on MultiPac configuration and operational requirements. To configure MultiPac power requirements in Grid Connect mode: • CRMS: From the menu, select Settings > MultiPac Settings, enter the Turbine number in the adjacent field and set the toggle to Enable. • Display panel: Navigate as follows - System Data > System Configuration > Turbine Number and enter a unique turbine identifier. Then, navigate to System Data > System Configuration > MultiPac, and select Enable. System Configuration Parameter Description Parameter Value Default Grid Connect Menu Parameter Description Parameter Value Default System Configuration Parameter Description Parameter Value Default Turbine Number MultiPac Select a unique numerical identifier for MultiPac configuration Enables or disables MultiPac configuration 1 – 20 0 = Disable 1 = Enable 1 0 (Disabled) Page 16 of 23 410027 Rev F (February 2006) This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | TECH REF C30 Grid Connect Op

tech-ref-c30-grid-connect-op-016

PDF Search Title:

TECH REF C30 Grid Connect Op

Original File Name Searched:

410027_Grid_Connect.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP