Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Grid Connect Operation – Capstone Models C30 and C60/C65 Configuring Grid Connect Operating Mode Overview Grid Connect mode requires the user to electrically connect the MicroTurbine to the local utility. Once this is complete, simply apply utility grid power to begin operation. Refer to the Electrical Installation Technical Reference (410009) manual for detailed information on the interconnection requirements. After utility grid interconnections have been made, the following actions are performed: ElectricallyclosetheGridConnectcontactsinthecommunicationsbay(seeContact Terminal Location section) ConfigurethesoftwareforGridConnectoperationusingoneoftwomodesofaccess: User input – through the local display panel or CRMS Remote input – CRMS through either the RS-232 User or Maintenance port Enteraninitialsystempowerdemandvalue (Optional) Configure a Load Management mode to optimize performance. An external power meter must be connected when selecting Load Following Mode (Refer to the Configuring the Dispatch Modes section for more details). Normal mode (default) utilizes electric utility grid power in excess of MicroTurbine base power Load Following mode utilizes MicroTurbine power in excess of base power supplied by the utility grid (when required by external loads) Time of Use mode utilizes pre-determined settings to select the hours and power demands for MicroTurbine operation. (Optional) Enable Reverse Power Flow Protection, if required. An external power meter must be connected (Refer to Reverse Power Flow Protection section). (Optional)SelectAutoRestartmodetoautomaticallyattemptarestartafteranincident- driven fault. (Optional) Select MultiPac mode to combine MicroTurbine power in series with any of the above dispatch modes. (Optional)EnableFastTransferModetodecreasethetransitiontimetoGridConnect mode. IssueaStartcommandtocommenceMicroTurbineoperation. 410027 Rev F (February 2006) Page 2 of 23 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | TECH REF C30 Grid Connect Op
PDF Search Title:
TECH REF C30 Grid Connect OpOriginal File Name Searched:
410027_Grid_Connect.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |