logo

Stand Alone Operation – Capstone Model C30 and C60

PDF Publication Title:

Stand Alone Operation – Capstone Model C30 and C60 ( stand-alone-operation-–-capstone-model-c30-and-c60 )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 004

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Stand Alone Operation – Capstone Model C30 and C60 External Switch Contacts J12, Pin 4 (Start/Stop) J12, Pin 5 (Ground) SA Interlock Contacts J12, Pin 2 (SA) J12, Pin 5 (Ground) Battery Wake-up J10, Pin 2 (ISO BStart+) J10, Pin 3 (ISO BStart-) Figure 2. Stand Alone Contact Terminal Locations (Model C60) Battery Isolation Switch A battery isolation switch to disable the MicroTurbine for service or transport is located behind the lower kick panel on the C30 standard package, at the rear of C30 industrial package or inside the front door of the C60 package. Set the switch to ON for system operation. 410028-001 Rev. C (July 2004) Page 4 of 22 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Stand Alone Operation – Capstone Model C30 and C60

stand-alone-operation-–-capstone-model-c30-and-c60-004

PDF Search Title:

Stand Alone Operation – Capstone Model C30 and C60

Original File Name Searched:

stand_alone.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP