logo

440167A_C30-GC-SA-Retrofit

PDF Publication Title:

440167A_C30-GC-SA-Retrofit ( 440167a_c30-gc-sa-retrofit )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 010

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Work Instructions: Grid Connect to Stand Alone Retrofit – Model C30 Battery Pack Installation Procedure 1. Preparethebatterypack(521633-100)forinstallation.SeeFigure9. a. MakesurethatcircuitbreakerCB1issettoOFF. b. ConnectthethermistorcableconnectortothePM1connectorJ2onthe battery pack. c. Connect BCT-to-PM1 cable assembly W116 (507462-100) connector P1 to the PM1 connector J1 on the battery pack. Circuit Breaker CB1 Set to OFF J1 Thermistor Cable Connector BCT-to-PM1 Cable W116 J2 Figure 9 – Battery Pack Circuit Breaker Setting and PM1 Connection The battery pack weighs approximately 250 lb (113 kg). Use a forklift or other proper lifting equipment to lift and move the battery pack. 2. Installthebatterypack. a. MakingsurethatthePM1connectorisfacingtowardtheUserConnection Bay (UCB), use proper transportation equipment to place the battery pack in the MicroTurbine enclosure. b. Carefullyslidethebatterypackinplace,makingsurethatconnectorP1of cable assembly W116 (PM1), or the thermistor connector, does not touch the enclosure. c. Secure the battery pack to the enclosure with two bolts (507862-036), two washers (507750-001), and two lock washers (507874-001). See Figure 10 and Figure 11. 440167 Rev. A (March 2008) Page 10 of 15 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. WARNING

PDF Image | 440167A_C30-GC-SA-Retrofit

440167a_c30-gc-sa-retrofit-010

PDF Search Title:

440167A_C30-GC-SA-Retrofit

Original File Name Searched:

440167A_C30-GC-SA-Retrofit.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP