PDF Publication Title:
Text from PDF Page: 053
Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Application Guide: C200 Hazardous Location Turbine Assembly High voltage can injure or kill. Make sure no voltage is present at the pressure switch terminals before installing jumpers. See Figure 22. Before touching the terminals, measure the voltage between each point (Normally Closed NC, Common, Normally Open NO) and ground to make sure there is no voltage present. Place a jumper between terminals NO and C. Energize the controller. After three minutes, the controller will wake up the turbine assembly and will allow all permissives to start. Remove the jumper and secure the cover with the supplied bolts after troubleshooting and restore the turbine to normal operation. WARNING Pressure Transmitter Common NO NC Figure 22. Pressure Switch The pressure transmitters require no calibration. Refer to Pressure Transmitter in Appendix A (page A-7) for more details. Preventive Maintenance Refer to the Model C200 User’s Manual (400008) for preventive maintenance procedures. Refer to the Capstone Scheduled Maintenance Work Instructions (440000) for scheduled maintenance of internal components. Maintenance intervals may be more frequent due to conditions at the site. 480047 Rev. B (November 2010) Page 53 of 82 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.PDF Image | Application Guide Capstone Model C200 Hazardous Location Turbine Assembly
PDF Search Title:
Application Guide Capstone Model C200 Hazardous Location Turbine AssemblyOriginal File Name Searched:
480047B_C200_Hazloc_Package_AG.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |