logo

Application Guide Capstone Model C200 Hazardous Location Turbine Assembly

PDF Publication Title:

Application Guide Capstone Model C200 Hazardous Location Turbine Assembly ( application-guide-capstone-model-c200-hazardous-location-tur )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 051

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Application Guide: C200 Hazardous Location Turbine Assembly Maintenance When servicing any explosion-proof equipment, make sure all bolts are re-installed and securely tightened. When servicing the units, straight hex keys should be used instead of ball-end hex keys for door latches to prevent stripping the hex openings. General Inspection Inspect the enclosure for air or water leaks at seals and gaskets around doors, pipe connections, and conduit fittings. Also check for leaks through the screw threads securing the gland plates to the enclosure, as well as the gaskets around the screw latches on the doors. Refer to the Capstone Scheduled Maintenance Work Instructions (440000) for required inspection and replacement schedules of stainless steel package components. Maintenance Procedures The following paragraphs describe the maintenance procedures for the hazardous location components and enclosure. System Permissives During service, bypassing the pressure switch and purge time permissives is recommended. Temporarily reconfigure the Start priority to User and disable both fault inputs. This bypasses the control system permissives, except the Alarm2 level and fault for the gas detector. This option also inhibits the controller from controlling the turbine assembly. The turbine will not respond to a wake up command if the battery packs are switched off locally or remotely. In the case that the system needs to be tested with the control system operational, bypass the pressure switch as described in the Pressure Switch paragraph below. The turbine system produces and contains high voltage. High voltage can injure or kill. Obey all safety procedures when you work around electrical equipment. Only Capstone Authorized Service Providers are permitted access to the inside of the enclosure. WARNING Remove power and disconnect all circuits before servicing any electrical equipment in a classified area. The area around the hazardous location enclosure must be free of explosive gases before servicing the unit. WARNING CAUTION NOTE NOTE 480047 Rev. B (November 2010) Page 51 of 82 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Application Guide Capstone Model C200 Hazardous Location Turbine Assembly

application-guide-capstone-model-c200-hazardous-location-tur-051

PDF Search Title:

Application Guide Capstone Model C200 Hazardous Location Turbine Assembly

Original File Name Searched:

480047B_C200_Hazloc_Package_AG.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP