Anaerobic Digestion of farm and food processing residues GoodPractice Guidelines Page38 METHOD STATEMENT The method statement should spell out specific measures which developers plan to take to minimise disruption and mitigate any undesirable impacts during construction. It will have been negotiated as part of the planning permission and should be built into the contract with the contractors for the building. The method statement will need to provide detailed guidance for the construction contractors, but it would be good practice to produce an additional summary in plain English for local communities and the local planning authority. It is likely to include: Noise Reducing noise nuisance as much as possible by working only during the normal working day. It would be good practice to consult the local authority’s Environmental Health Officer who can advise on acceptable construction site noise levels. Developers will wish to consult and have regard to British Standard (BS) 5228 on Noise Control on Construction and Demolition. Timing Timing construction carefully, to avoid damage if the area or surroundings are environmentally sensitive (eg at certain times of year): there should also be consultation with the local planning and highway authorities regarding proposed traffic movements. Dust Water can be used to suppress dust. Care is needed, however, to avoid excessive application of water so that suspended silt is not washed into a drain or watercourse. Lighting Consultation is recommended with the local authority’s Environmental Health Officer for advice on guidelines on light pollution (details on light pollution are given on page 40). Size of construction compound The site will need to be sufficiently large to allow space for mitigation of any construction impacts, as well as simply meeting the physical needs of construction. Attention should be given to returning the surrounding area to its original status after construction. Spillages Measures to reduce or contain spillages, such as bunding, would probably be a condition of planning permission. Duration of construction An estimated construction timetable should be included in the method statement; construction of an AD plant would normally take from 3-12 months. Transport and traffic The construction process might require consideration of: • Off-site highway changes such as setting back hedges, hedge- trimming • Bridges: need to consider loading and height • Road developments eg road widening. Such works should be the subject of early discussions with the planning authority and highway authority as they will need to be identified in the planning application. Road widening and other highway alteration works are likely to be covered by legal agreements under the Town and Country Planning Act 1990 and the Highways Act 1980.PDF Image | Anaerobic Digestion Of farm and food Processing residues The development of a sustainable industry
PDF Search Title:
Anaerobic Digestion Of farm and food Processing residues The development of a sustainable industryOriginal File Name Searched:
biogas10.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP |