logo

Residential Hannam Luxury Apartments

PDF Publication Title:

Residential Hannam Luxury Apartments ( residential-hannam-luxury-apartments )

Next Page View | Return to Search List

Text from PDF Page: 001

Residential Hannam Luxury Apartments In Korea, a company’s utility rate exponentially rises with increased energy consumption. As a result, some large energy consumers are opting out of utility power and turning to cost-saving, reliable Capstone MicroTurbines®. When design for the luxury Hannam apartment complex was underway in 2009, engineers decided to invest in six C65 microturbines to support the massive complex’s energy needs and save money. As the new 600-unit, 170,000-square-meter (1,829,863-square-foot) apartment complex was constructed in 2010, Korean distributor Samsung C&T Corporation, installed the microturbine system in a combined heat and power (CHP) application. Using liquid natural gas, the CHP system now generates 390kW of electricity for residential use and 985kW of thermal power to heat the complex’s expansive swimming pool and sauna. Since January 2011, the onsite microturbine system has operated continuously to support 60 percent of the building’s total electricity needs and more than 30 percent of its heating needs. The result: comfortable residents and a manageable energy bill. In fact, the Hannam apartment complex is expected to save KRW 원1,121,150,000 annually. Today, the foresight of Hannam owners is paying off as the grid- connected CHP system allows the owners to purchase less than half of the complex’s electricity from the national utility company – a massive relief as utility rates continue to rise.  21211 Nordhoff Street • Chatsworth • CA • 91311 • 866.422.7786 • 818.734.5300 • www.capstoneturbine.com ©2011 Capstone Turbine Corporation. P1012 Case Study CAP402 At a glance Location Seoul, South Korea Commissioned January 2011 Fuel Liquid natural gas Technologies • Six C65 Capstone microturbines. • A heat exchanger from Korean manufacturer SIN-AN. Results • The CHP system generates 390kW of electricity for residential consumption and 985kW of thermal power to heat the expansive swimming pool and luxurious sauna. • Since January 2011, the microturbine system has operated continuously. • The microturbine system supports 60% of the building’s total electricity needs and more than 30% of its heating needs. • The apartment complex is expected to save KRW 원1,121,150,000 annually.

PDF Image | Residential Hannam Luxury Apartments

residential-hannam-luxury-apartments-001

PDF Search Title:

Residential Hannam Luxury Apartments

Original File Name Searched:

CS_CAP402_Hannam_lowres.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP