logo

Government/Municipal York Wastewater Treatment Plant

PDF Publication Title:

Government/Municipal York Wastewater Treatment Plant ( government-municipal-york-wastewater-treatment-plant )

Next Page View | Return to Search List

Text from PDF Page: 001

Government/Municipal York Wastewater Treatment Plant When the energy bills at York Wastewater Treatment Plant in Pennsylvania topped $63,000-per-month, York officials knew it was time to replace the plant’s aging internal combustion engines. After in-depth research, they selected a Capstone microturbine combined heat and power system that promised lower total lifecycle costs, less maintenance, fewer emissions, and unmatched efficiency. Today, a Capstone C1000 and C600 operate on natural gas and biogas produced from York’s 26 million gallons of sewage each day. The side-by-side power packages produce 40 percent more power using the same amount of natural gas as the former internal combustion engines. This custom configuration allows the plant to operate in a digester/natural gas base mode, natural gas peak shaving mode, and provide 1.6 MW of backup power. In addition to cutting electricity costs, the plant further reduced its operating costs by recovering the microturbine exhaust heat and using it in the onsite digestion process, allowing for the more efficient breakdown of sewage, and in turn, generation of more methane gas. The methane gas enables the microturbines to efficiently generate 24/7 baseload electricity for the entire plant. The air-cooled, liquid-free power system frees the plant from power interruptions and staff from burdensome maintenance needs. Another convenience factor – the plant is no longer required to report emission levels to Pennsylvania’s Department of Environmental Protection because the microturbines generate a negligible amount of pollutants. A natural gas and methane gas fueled Capstone C1000 and C600 at York’s wastewater treatment plant save energy, cut operational costs and protect the environment by generating clean-and-green electricity. 21211 Nordhoff Street • Chatsworth • CA • 91311 • 866.422.7786 • 818.734.5300 • www.capstoneturbine.com ©2012 Capstone Turbine Corporation. P1012 Case Study CAP347

PDF Image | Government/Municipal York Wastewater Treatment Plant

government-municipal-york-wastewater-treatment-plant-001

PDF Search Title:

Government/Municipal York Wastewater Treatment Plant

Original File Name Searched:

CS_CAP347_York_PA_lowres.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP