Behavior of Capstone and Honeywell Microturbine Generators During Load Changes Consultant Report

PDF Publication Title:

Behavior of Capstone and Honeywell Microturbine Generators During Load Changes Consultant Report ( behavior-capstone-and-honeywell-microturbine-generators-duri )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 019

Behavior of Capstone and Honeywell Microturbine Generators During Load Changes Table 7. Shutdown Sequence for Capstone 28-kW MTG MTG State Time of Transition to Next State Events Unit on Trip Fuel off Cool down Spin down Turn off Unit off 14:46:09 14:46:15 14:46:30 14:56:21 14:56:35 14:56:46 Unit running Unit trip, start power ramp-down Shut off fuel to MTG, complete power ramp-down Cool down unit at 45,000 RPM Turbine spins down to stop Power to DC link and AC input off Unit stopped MTG start up was captured with data taken at two-second intervals. The complete start sequence from front panel initiation to full power output was two minutes and four seconds. Because the MTG had only been shut down a short time (about two minutes), the warm-up period might have been shorter than it would have been if the unit was cold at the start. The timing and sequence of the start are shown in Table 8 below. Table 8. Start-up Sequence for Capstone 28-kW MTG MTG State Unit off Spin unit Wait Fuel on Warm up Ramp Unit on 3.4.2 Honeywell Time of Transition to Next State 14:58:12 14:58:15 14:58:36 14:58:47 14:59:40 15:00:16 Events Unit stopped Power to DC link, spin turbine to 25,000 RPM Stabilize MTG Turn on fuel and ignite, ramp to 45,000 RPM Warm up MTG Ramp up power to full power Unit running From the graphs of the MTG output (Appendix C), turbine ramping times were determined. These times are shown in Table 9 below. 12

PDF Image | Behavior of Capstone and Honeywell Microturbine Generators During Load Changes Consultant Report

behavior-capstone-and-honeywell-microturbine-generators-duri-019

PDF Search Title:

Behavior of Capstone and Honeywell Microturbine Generators During Load Changes Consultant Report

Original File Name Searched:

2004-05-24_500-04-021.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP