logo

Astor Chocolate

PDF Publication Title:

Astor Chocolate ( astor-chocolate )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 002

“The Capstone microturbines have paid for themselves and proven to be dependable and reliable.” — Joe Verschleisser, Plant Engineering Manager Astor Chocolate Capstone’s products and selected microturbines for their simplicity in creating a turnkey installation, trigeneration capabilities, reliability, low installation and maintenance costs, and ‘greenness’ in reducing Astor’s carbon footprint. The original design criteria included a minimum of 260kW of trigeneration to simultaneously address power, heating, and cooling needs. Capstone microturbines were chosen for their superior performance over standard reciprocating-generator solutions. Verschleisser added, “The Capstone microturbines have paid for themselves and proven to be dependable and reliable.” New Jersey Natural Gas provides the microturbines’ fuel. An additional 300kW diesel generator sits onsite. During a blackout the generator runs in tandem with the microturbines to augment Astor’s stand-alone backup capacity plan. The microturbine-powered CCHP system processes captured waste heat energy from the microturbines and heats water fed to an absorption chiller to create air conditioning for the building. The captured waste heat also supplements facility heating and hot water use for Astor’s 120,000-square-foot building. The trigeneration system provides about 80 percent of the thermal energy needed over the course of a year. Each C60 has an integrated Capstone Heat Recovery Module that generates a combined 2 million BTUs of hot water. Capstone microturbines provide cooling, heating, and power at Astor Chocolate in New Jersey. A 100-ton absorption chiller replaced natural-gas powered reciprocating chillers. Hot water flows into the absorption chiller that provides air conditioning to the manufacturing area and keeps the finished chocolate cool in the warehouse. The microturbines were commissioned in January 2006 and are programmed to run 24/7 with a 99 percent uptime. The Capstone microturbines require no lubrication, which eliminates disposal issues, as the microturbines feature the company’s patented, maintenance-free air bearings. Astor Chocolate is pleased with its Capstone microturbines – and even more pleased to save money while saving the environment. Astor’s Verschleisser concluded, “Astor is proud of our accomplishments in going green.” 21211 Nordhoff Street • Chatsworth • CA • 91311 • 866.422.7786 • 818.734.5300 • www.capstoneturbine.com ©2009 Capstone Turbine Corporation. P0911 Case Study CAP389

PDF Image | Astor Chocolate

astor-chocolate-002

PDF Search Title:

Astor Chocolate

Original File Name Searched:

CS_CAP389_AstorChocolate_lowres.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP