As the saying goes, information is power. The Green Data Center at SU That has never been a truer statement than today, when the world depends on the data flowing through our electronic lines of communication. But power comes at an increasingly high cost, both in dollars and environmental impact on our planet. That is why Syracuse University, IBM, and New York State joined together to create the Green Data Center. Through a combination of new innovations and smarter technologies, this partnership has created one of the most energy-efficient data centers in the world. As part of its “Smarter Planet” initiative, IBM has worked with SU to look beyond computer hardware and software to the actual infrastructure of the data center. The Green Data Center—with its own electrical tri-generation system and IBM’s latest computers and computer-cooling technology—is expected to use 50 percent less energy than a typical computer center, making it one of the “greenest” in operation today. The Green Data Center is a showcase that will demonstrate how energy-efficient technologies can reduce energy costs and environmental impact. And it is a perfect example of how cross-sector partnerships—the foundation of Scholarship in Action—can truly change the world. From end to end, the Green Data Center uses new ideas to reduce power loss, increase efficiency, and reuse waste energy. The project has been registered with the U.S. Green Building Council, the first step toward LEED (Leadership in Energy and Environmental Design) Green Building Certification. 1 Capstone Hybrid UPS Turbines The data center’s electrical tri-generation system uses 12 patented, natural-gas-fueled microturbines to provide electricity for the Green Data Center. Ten of the microturbines can generate all of the power needed, enabling the data center to operate completely off-grid. Where a typical data center converts alternating current (AC) power from the utility’s electrical grid to direct current (DC) to power theservers,thesemicroturbinescangenerate any combination of AC and DC power on site, avoiding the loss of power that typically occurs during transmission and conversion. In addition, the heat generated by the turbines is not wasted. The hot exhaust is piped to the chiller room, where it is used to generate cooling for the servers and heating and cooling for the adjacent office building. Thermax Absorption Chillers Waste heat from the microturbines is sent to these two absorption chillers, which operate on the principal that water in a vacuum evaporates at very low temperature. The vacuum is maintained by circulating a lithium bromide solution that absorbs the vapor from the evaporating water. The heat from the 585oF (307oC) turbine exhaust re-concentrates the solution and releases the water vapor, which is thenre-condensedinacoolingtower.Thisunique double-effect process increases the amount of cooling generated. The 45oF (7oC) water is then piped to the Production Data Center to cool the servers. With no moving parts apart from the water pumps, these chillers are extremely reliable and quiet. Their capacity—equivalent to 300 tons of ice—produces approximately three times the cooling needed by the data center. The excess chilled water is piped to the adjacent office building at 621 Skytop for air conditioning. 3 Cain Heat Exchangers During the winter, the 585oF (307oC) exhaust from the microturbines flows through these heat exchangers to produce hot water, capturing valuable energy that would otherwise be wasted. The water is then piped to 621 Skytop to provide free heating for the much larger office building. 4 UninterruptiblePowerSupply(UPS) Forty-four tons of sealed batteries provide emergency backup power in the unlikely event that all 12 turbines and the utility grid fail to provide enough electricity to maintain operations. The battery banks generate at least 17 minutes of full data center power, permitting an orderly shutdown of computers in the event of a calamity. 5 Switchgear Switchgear and other equipment direct electric power supplied to the data center. The equipment routes power: > From the turbines to the computers. > From the turbines to the backup batteries, to keep them fully charged. > From the batteries to the turbines, to restart idle turbines. 6 IBMRearDoorHeateXchanger Cooled water from the absorption chillers is pumped through pipes beneath the floor to special heat exchanger-equipped “cooling doors” on the server racks. The doors remove heat from each rack far more efficiently than conventional air conditioning methods. Sensors monitor server temperatures and usage to tailor the amount of cooling delivered, further reducing energy waste and expense. Adjacent Office Building (621 Skytop) Chilled Water Heated Water Chilled Water 2 Chiller Room 3 Production Data Center 6 2 Turbine Exhaust AC Power DC Power DC Power Turbine Room 1 Electrical Room 5 Battery Room 4 Natural Gas Main Fuel Source Propane Backup Fuel Source Power From Grid

PDF Image | As the saying goes, information is power. The Green Data Center at SU

as-saying-goes-information-is-power-the-green-data-center-at-001

PDF Search Title:

As the saying goes, information is power. The Green Data Center at SU

Original File Name Searched:

GDC_facts.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP