logo

CAPSTONE AIR PACK INSTALLATION PROCEDURE

PDF Publication Title:

CAPSTONE AIR PACK INSTALLATION PROCEDURE ( capstone-air-pack-installation-procedure )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 030

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Capstone Air Pack: Installation Procedure COMMISSIONING CHECKLIST (Cont’d) (Page 2 of 2) Inspections Mechanical 1. Does the installation meet service/access specifications? 4. Does the installation meet service specifications including the 31-inch clearance zone? 5. Does the enclosure and conduit installation meet all mechanical and code requirements? Electrical/Communications 1. Are control wires run in a separate conduit from the power cables? Yes ___ Yes ___ Yes ___ Yes ___ No ___ No ___ No ___ No ___ 2. Has the entire air system from the Air Pack through to the MicroTurbine inlet(s) been tested and fixed for leaks under Air Pack operating conditions? Yes ___ No ___ 3. Is this an Indoor or Outdoor Installation and is it in a salt air environment? Indoor _____ Outdoor ____ Salt air _____ 6. Is installation properly corrosion proofed, especiallly if in salt air environment? Yes ___ No ___ 2. Are the proper color wires including chassis ground connected to corresponding DC/ground terminals of the MicroTurbine? (Follow all safety precautions) Yes ___ No ___ 3. Are the metallic conduits for power wiring grounded at the penetration points for both the MicroTurbine and the Air Pack? Yes ___ No ___ 4. Are the metallic conduits for the control wiring grounded at the penetration points for both the MicroTurbine and the Air Pack? Yes ___ No ___ 5. Are the DC power cables inside liquid tight UL conduit? Yes ___ No ___ 480038 Rev A (March 2008) Page A-4 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | CAPSTONE AIR PACK INSTALLATION PROCEDURE

capstone-air-pack-installation-procedure-030

PDF Search Title:

CAPSTONE AIR PACK INSTALLATION PROCEDURE

Original File Name Searched:

480038A_Air_Pack_Instal_Proc.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com | RSS | AMP