C200 Legacy Engine Injector Upgrades

PDF Publication Title:

C200 Legacy Engine Injector Upgrades ( c200-legacy-engine-injector-upgrades )

Next Page View | Return to Search List

Text from PDF Page: 001

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Telephone: (818) 734-5300 • Fax: (818) 734-5320 • Web: www.capstoneturbine.com Service Bulletin SB0114 Date: From: Subject: April 4, 2013 Capstone Technical Support C200 Legacy Engine Injector Upgrades Systems Affected Model C200 and C1000 Series (C600/C800/C1000) engines listed in Table 1. Summary Capstone has introduced flexible (“bellows”) injectors to improve combustion stability and combustor liner life. Legacy C200 engines listed in Table 1 do not yet have these injectors installed. These engines require the installation of a kit that consists of 4 flexible and 2 fixed injectors. Capstone will provide incident report (IR) numbers and ship appropriate kits for systems listed in Table 1. Required Action • Systems identified in Table 1 must install the kit(s) indicated. Refer to C200/C1000 Gaseous Fuel Injector Replacement Work Instruction (440193 Rev C or later) for specific instructions. o ForsystemsnotyetcommissionedasofApril15,2013,kitsmustbeinstalled prior to or at time of commissioning in order to maintain warranty/FPP coverage on the engine. o ForsystemsalreadycommissionedasofApril15,2013,kitsmustbeinstalled within 30 days of receipt of parts from Capstone in order to maintain warranty/FPP coverage on the engine. 450120 Rev A (April 2013) Page 1 of 3 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. Copy is uncontrolled; user is responsible for verifying current revision.

PDF Image | C200 Legacy Engine Injector Upgrades

PDF Search Title:

C200 Legacy Engine Injector Upgrades

Original File Name Searched:

SB0114_450120A_C200-C1000_Legacy_Engine_Injector_Upgrade.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)