PDF Publication Title:
Text from PDF Page: 010
Panel Mounting: ST PETERSBURG SECTION 2 ELECTRICAL INSTALLATION The standard design for nearly all Unison Solutions gas conditioning skids includes a skid designed to be mounted in a Class I Division 1 area, and a control panel designed to be mounted in an unclassified area. Therefore, nearly all skid control panels are shipped loose to be field installed at a location remote from the skid. The following installation instructions describe this scenario. In addition to the skid control panel, some skids have separate motor control panels, gas monitoring panels, or other auxiliary electrical panels which need to be mounted in unclassified areas. If the panels included with the skid are not free standing and are not provided with their own stands, then mounting height instructions will be attached to each panel so that they can be wall mounted to achieve an optimum height for viewing display screens and operating controls. Panels can be mounted outdoors only if the panel holds an outdoor rating. Follow local and national electric codes for all panel installations. Conduit and Wiring Rigid metal conduit will need to be run between the electrical panel(s) and one or more explosion proof motors and J-boxes on the skid. The maximum conduit run distance should be limited to 200 ft to avoid signal losses in the field wiring. A conduit plug should then be installed into any unused holes in the skid J-boxes. Explosion proof flexible conduit connecters should be used to connect to motors. A conduit seal off should be installed in each conduit run to the skid within 10’ of either side of the Class I Division 1 boundary. Electrical seal offs included on the skid at the time of shipment Section 2 Installation Page 5PDF Image | ST PETERSBURG TABLE OF CONTENTS
PDF Search Title:
ST PETERSBURG TABLE OF CONTENTSOriginal File Name Searched:
Gas_Skid_Manual.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)