Technical Reference Capstone MicroTurbine Installation and Permitting Guidelines

PDF Publication Title:

Technical Reference Capstone MicroTurbine Installation and Permitting Guidelines ( technical-reference-capstone-microturbine-installation-and-p )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 009

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Technical Reference: Capstone MicroTurbine Installation and Permitting Guidelines Items to Think About Refer to Electrical Technical Reference Documents 410000 and 410001 and Electrical Installation Technical Reference Document 410009 for information regarding operating modes, grid and transformer connection methods, switchgear wiring, etc. A single earth ground is mandatory. Grounding must be made in such a manner that is consistent with Electrical Installation Technical Reference Document (410009) and local codes. Sheet metal screws are generally not permitted to attach ground leads or lugs to equipment. Followthetypicalratesforcircuitbreakerandwiresizingaspresentedindocument 410009, or in accordance with the National Electric Code. Perform load-profiling analysis to determine a customer’s demand and power quality (for Stand Alone systems, especially). A power transformer (minimum of 45 kVA for a C30 or 90 kVA for a C60/C65) will be required for some installations. Refer to 410009. If the MicroTurbine is a Stand Alone configuration, it incorporates a battery pack. The battery is a gel cell lead acid sealed battery. There is no maintenance or venting. Conductor size and insulation type must be determined based on total maximum MicroTurbine units and installation conditions. Rigid, EMT, or weather-tight flex conduit may be used per local codes. Flexible conduit may have restrictions on length, location of service, protection, voltage, current, end fitting type and material. Service access requirements vary based on location, surrounding material, and grounding properties. ServiceaccessmaybereducediftheMicroTurbinecanberolledoutforservice. Access passage (doorways and hallways) to the service access area may be defined based on voltages, currents and size of unit per Mechanical codes. ElectricalservicetotheMicroTurbinelocationmaycomeunderground,above ground, supported from ceiling, or attached to wall, per local codes but note the following: o Thedepththatconduitsmustbeburiedchangesbasedonwhetherthe conduit is under a building, parking lot or concrete of different thicknesses. o Aboveequipmentconduitrunsaresubjecttoheightandsupport requirements per NEC and Mechanical codes. o Frequencyofsupportorattachmentandproximitytonearestendpointvaries depending on conduit type, per NEC. 410034 Rev E (December 2005) Page 9 of 16 This information is proprietary to Capstone Turbine Corporation. Neither this document nor the information contained herein shall be copied, disclosed to others, or used for any purposes other than the specific purpose for which this document was delivered. Capstone reserves the right to change or modify without notice, the design, the product specifications, and/or the contents of this document without incurring any obligation either with respecttoequipmentpreviouslysoldorintheprocessofconstruction. PleasenotethatCapstoneisonlyresponsiblefortheMicroturbineandotherCapstoneproductsitsells,asprovidedforinCapstone’sProduct Specifications and warranties. Information provided in this document that relates to the system, as opposed to the Microturbine or other Capstone products, is not an indication that Capstone is taking responsibility for the systeminanywayandisprovidedonlyasgeneralguidance. CalculationsandtestingmustbeperformedtoverifythatdesignsolutionscomplywithalloftherequirementsofCapstone'sProductSpecification. All informationcontainedinthisdocumentisprovidedonan“asis”basis,anddoesnotaffectorchangeCapstone'sProductSpecificationsorwarranties. InnoeventwillCapstonebeliablefordamagesarisingdirectlyor indirectly from any use of the information contained in this document.

PDF Image | Technical Reference Capstone MicroTurbine Installation and Permitting Guidelines

PDF Search Title:

Technical Reference Capstone MicroTurbine Installation and Permitting Guidelines

Original File Name Searched:

410034_Installation_Permitting.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)