Technical Reference Capstone MicroTurbine Electrical Installation

PDF Publication Title:

Technical Reference Capstone MicroTurbine Electrical Installation ( technical-reference-capstone-microturbine-electrical-install )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 026

Capstone Turbine Corporation  21211 Nordhoff Street  Chatsworth  CA 91311  USA Technical Reference: Capstone MicroTurbine Electrical Installation breaker disconnect must be included between the batteries and the unit. See the C65 Hybrid UPS Application Guide (Refer to Table 1) for more details on battery system specification. Three- or four-wire connections are allowable, as shown in Figure 20 and Figure 21. For four- wire connections, the critical loads need not be balanced as long as the current limits per phase are not exceeded. 7.1. Surge Protection Device Due to the unique internal architecture of the C65 Hybrid UPS system, a surge protection device must be installed on the grid-side connection of the isolation transformer for each unit. Capstone will provide the device required for UL installations as well as any other 4-wire 480Y/277V installations. All other wiring configurations will require an alternative surge protection device, which must be specified with the assistance of Capstone Applications Engineering. The spec sheet and installation documents from the manufacturer are listed in Appendix of the C65 Hybrid UPS Application Guide (480049). The required connections for the surge protection device are described in detail in Figure 20 through Figure 22 below. The device should be mounted with leads as short as possible, recommended not to exceed 1m in length. WARNING: Three-wire critical load connections are allowable as long as the neutral on the critical load side of the isolation transformer is grounded AND the critical loads are BALANCED. No unbalanced critical loads are allowed for 3-wire critical load connections. 7.2. Allowable Connections Table 6. HUPS Allowable Connections 16 X X Yes Wye/Wye Supplied by Capstone Figure No. Grid Connection Wiring Critical Load Connection UL2200/1741 Compliance Isolation Transformer Windings Surge Protection Device 4-wire 3- wire 4-wire 3-wire 17 X X Yes Wye/Wye Contact Applications Engineering 18 X X No Wye/Delta Contact Applications Engineering 410009 Rev F (October 2013) Page 26 of 31 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | Technical Reference Capstone MicroTurbine Electrical Installation

PDF Search Title:

Technical Reference Capstone MicroTurbine Electrical Installation

Original File Name Searched:

410009F_TR_ELECTRICAL_INSTALLATION.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)