PDF Publication Title:
Text from PDF Page: 024
Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Capstone Gas Pack: Installation Procedure Capstone Gas Pack Capstone C60/C65 MicroTurbine 3-phase AC High Voltage DC 14-Gauge (-) 600 V (Black) Ground (+) Stud JUCB FLT1 Control Run Fault 1 Chassis Ground 2 4 + _ J12 GND Chassis Shield J15 AC1-B AC1-A Power 14-Gauge 600 V (Red) 14-Gauge 600 V (Green) 1 2 3 3 Gnd - - Gnd 4-conductor 20-Gauge 1/2-inch Conduit, UL 4 Shielded cable GND FLT1 AC1-B 1/2-inch Conduit, UL ++ AC1-A Figure 19. Wiring Between DC Gas Pack and UCB (without Precharge) c. For UCBs with a Precharge Assembly in HVDC Bay: Cut away the Anderson connectors from the red and black DC power wires from the Gas Pack. Strip each wire end by 1⁄2 inch, twist the wire strands and tin the stripped area. Referring to Figure 20, insert the red wire fully into the left terminal and make sure that no bare wire is exposed (cut away as necessary) and tighten in place. Repeat for black wire but insert it into the right terminal. Connect the green wire to the ground stud in HVDC bay wall using an 8mm socket wrench. 480018 Rev C (March 2008) Page 24 of 31 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction. CAUTION Ensure that the red wire is connected to the left terminal and black wire is connected to the right terminal, and no bare wire is exposed after connecting the red and black wires, as shown in Figure 20.PDF Image | CAPSTONE GAS PACK INSTALLATION PROCEDURE
PDF Search Title:
CAPSTONE GAS PACK INSTALLATION PROCEDUREOriginal File Name Searched:
480018C_AG_GASPACK_INSTALL_PROC.pdfDIY PDF Search: Google It | Yahoo | Bing
Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info
Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info
Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info
Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info
BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info
Publications: Capstone Turbine publications for microturbine and distributed energy More Info
FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info
CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info
Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info
CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)