ADVANCED POWER SERVER (APS) INSTALLATION SPECIFICATION

PDF Publication Title:

ADVANCED POWER SERVER (APS) INSTALLATION SPECIFICATION ( advanced-power-server-aps-installation-specification )

Previous Page View | Next Page View | Return to Search List

Text from PDF Page: 009

Capstone Turbine Corporation • 21211 Nordhoff Street • Chatsworth • CA 91311 • USA Advanced Power Server (APS): Installation Specification Service Clearance Front Clearance: Allow a minimum service clearance of 36 inches from the front panel (see Figure 5). Side Clearance: A minimum clearance of 2 inches on both the right and left sides should be allowed for cooling purposes (see Figure 5). Mounting Requirements The weight of the APS system is approximately 115 lbs for APS-115-CXXX or APS-130-0XXX (consult factory for APS-130-CXXX). Use appropriate equipment to lift the APS. The APS should be mounted away from a cold surface, or adequate insulation should be provided to ensure an internal temperature above 32 °F. The APS display should be wall or rack mounted with the display centered at eye level (approximately 5 ft, 6 inches). The APS mounting dimensions and orientation are shown in Figure 5 for models APS-115- CXXX and APS-130-0XXX (consult factory for APS-130-CXXX). The APS LCD display should not be exposed to direct sunlight (degrades LCD display). If this is not possible, a sun visor/shade should be implemented during installation. Mounting holes are shown on Figure 5 for models APS-115-CXXX and APS-130-0XXX (consult factory for APS-130-CXXX). Note: Mounting bolts are customer-provided. Dimensions are in (inches) [mm]. Figure 5. Mounting Dimensions and Clearances (Note Mounting Holes) 480024 Rev A (June 2007) Page 9 of 26 Capstone reserves the right to change or modify, without notice, the design, specifications, and/or contents of this document without incurring any obligation either with respect to equipment previously sold or in the process of construction.

PDF Image | ADVANCED POWER SERVER (APS) INSTALLATION SPECIFICATION

PDF Search Title:

ADVANCED POWER SERVER (APS) INSTALLATION SPECIFICATION

Original File Name Searched:

480024_APS_Installation_Spec.pdf

DIY PDF Search: Google It | Yahoo | Bing

Capstone Turbine and Microturbine: Capstone microturbines used and new surplus for sale listing More Info

Consulting and Strategy Services: Need help with Capstone Turbine, sizing systems, applications, or renewable energy strategy, we are here to assist More Info

Container Lumber Dry Kiln: Since 1991 developing and innovating dry kilns using standard shipping containers More Info

Supercritical CO2 Lumber Dry Kiln: Compact fast drying in 3 days or less for small amounts of wood and lumber drying More Info

BitCoin Mining: Bitcoin Mining and Cryptocurrency... More Info

Publications: Capstone Turbine publications for microturbine and distributed energy More Info

FileMaker Software for Renewable Energy Developing database software for the renewable energy industry More Info

CO2 Gas to Liquids On-Demand Production Cart Developing a supercritical CO2 to alcohol on-demand production system (via Nafion reverse fuel cell) More Info

Stranded Gas for low cost power Bitcoin Mining Using stranded gas for generators may provide breakthrough low power costs for cryptocurrency miners. More Info

CONTACT TEL: 608-238-6001 Email: greg@globalmicroturbine.com (Standard Web Page)